Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 64.3 m = 211.0 ft
Main Spans: 2 at 31.7 m = 104.0 ft
Approach Spans: 0
Skew: 55
Width, Roadway: 25.5 m = 83.7 ft (6 Lanes) and Out-To-Out: 26.5 m = 86.9 ft for a 24.4 m = 80.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Bedford [05320]: Westchester County [119], New York [36]
Owned by State Highway Agency [01], DOT District: 87
JCT RTS I684+35
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Poor [4]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 55.3 metric ton = 60.8 tons (Allowable Stress(AS) [2])
Inventory: 28.1 metric ton = 30.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 23500 (2017) and Trucks: 6%
Future ADT: 23610 (In 2039
)