HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


T-521 PAROLARI RD over LITTLE TOBY CREEK (Route: 0)
Num:15744x
Open: no restriction [A]
Built: 1916, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 14.9 m = 48.9 ft
Main Spans: 1 at 14.9 m = 48.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.7 m = 15.4 ft (1 Lanes) and Out-To-Out: 5.6 m = 18.4 ft for a 4.3 m = 14.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Horton [35816]: Elk County [047], Pennsylvania [42]
Owned by Town or Township Highway Agency [03], DOT District: 2
700 FT EAST SR 219
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49 metric ton = 53.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 100 (2019) and Trucks: 1%
Future ADT: 125 (In 2039 )
SR 153-PA 153 over TOBY CREEK (Route: 153)
Num:15534x
Open: no restriction [A]
Built: 1961, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 32 m = 105.0 ft
Main Spans: 2 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.3 m = 27.2 ft (2 Lanes) and Out-To-Out: 9.9 m = 32.5 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Horton [35816]: Elk County [047], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 2
1 MI SW CHALLENGE
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 16.3 metric ton = 17.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 5.8 km = 3.6 mi
Traffic
ADT: 2363 (2019) and Trucks: 21%
Future ADT: 2812 (In 2040 )
T-336 (CROSS ROAD) over BEAR RUN (Route: 0)
Num:40006x
Open: no restriction [A]
Built: 1997, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 6.1 m = 20.0 ft
Main Spans: 1 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.7 m = 28.5 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Horton [35816]: Elk County [047], Pennsylvania [42]
Owned by Town or Township Highway Agency [03], DOT District: 2
495' EAST OF SR 219
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 49 metric ton = 53.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 250 (2019) and Trucks: 1%
Future ADT: 400 (In 2039 )
SR 153-PA 153 over BEAR RUN (Route: 153)
Num:15533x
Open: no restriction [A]
Built: 1961, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 8.2 m = 26.9 ft
Main Spans: 1 at 7.6 m = 24.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.6 m = 38.1 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Horton [35816]: Elk County [047], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 2
1 MI SW CHALLENGE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 53.5 metric ton = 58.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 5.8 km = 3.6 mi
Traffic
ADT: 2363 (2019) and Trucks: 21%
Future ADT: 2812 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider