Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 136.6 m = 448.2 ft
Main Spans: 5 at 26.8 m = 87.9 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 14 m = 45.9 ft (4 Lanes) and Out-To-Out: 18.4 m = 60.4 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fremont [28826]: Sandusky County [143], Ohio [39]
Owned by County Highway Agency [02], DOT District: 2
.1 MI. EAST OF FRONT ST.
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 38.9 metric ton = 42.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 22.7 metric ton = 25.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 16476 (2015) and Trucks: 2%
Future ADT: 22869 (In 2038
)