Bridge Type
Main Span(s): Concrete [1] Other [00]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 15.5 m = 50.9 ft
Main Spans: 1 at 14.9 m = 48.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 5.5 m = 18.0 ft (2 Lanes) and Out-To-Out: 6.7 m = 22.0 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Bureau County [011], Illinois [17]
Owned by Town or Township Highway Agency [03], DOT District: 3
3 MI E OF MINERAL
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design:
Operating: 41.5 metric ton = 45.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 24.9 metric ton = 27.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 10 (2010) and Trucks: 0%
Future ADT: 11 (In 2032
)