Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 478.8 m = 1570.9 ft
Main Spans: 9 at 61 m = 200.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 43.3 m = 142.1 ft (8 Lanes) and Out-To-Out: 43.9 m = 144.0 ft for a 31.4 m = 103.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fairview Park [26446]: Cuyahoga County [035], Ohio [39]
Owned by State Highway Agency [01], DOT District: 12
2.07 MI. W. OF JCT. I-71
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 16.2 metric ton = 17.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 109150 (2015) and Trucks: 5%
Future ADT: 151500 (In 2038
)