HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


IA 92 over MISSISSIPPI RIVER & RR (Route: 92)
Num:38201x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 919.9 m = 3018.2 ft
Main Spans: 1 at 156.1 m = 512.2 ft
Approach Spans: 23
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 5.21 m = 17.1 ft and Navigational Clearance: 19.8 m = 65.0 ft
Location
Unknown [05330]: Muscatine County [139], Iowa [19]
Owned by State Highway Agency [01], DOT District: 5
IN MUSCATINE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.1 metric ton = 48.5 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 8.4 km = 5.2 mi
Traffic
ADT: 3780 (2019) and Trucks: 7%
Future ADT: 3780 (In 2039 )
E 2ND ST over MAD CREEK (Route: 0)
Num:37950x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 29.9 m = 98.1 ft
Main Spans: 2 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 17.7 m = 58.1 ft for a 13.7 m = 44.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [05330]: Muscatine County [139], Iowa [19]
Owned by City or Municipal Highway Agency [04], DOT District: 5
3.4 MI. E OF W JCT. US 61
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 62.9 metric ton = 69.2 tons (Load Factor(LF) [1])
Inventory: 37.6 metric ton = 41.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 9200 (2014) and Trucks: 0%
Future ADT: 9200 (In 2039 )
ILL 92 FAP 599 over MISSISSIPPI RIVER (Route: 92)
Num:81991000000000x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 919.9 m = 3018.2 ft
Main Spans: 1 at 156.1 m = 512.2 ft
Approach Spans: 23
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 19.8 m = 65.0 ft
Location
Unknown [00000]: Rock Island County [161], Illinois [17]
Owned by State Highway Agency [01], DOT District: 2
IN MUSCATINE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.3 metric ton = 66.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 36 metric ton = 39.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 8.4 km = 5.2 mi
Traffic
ADT: 3500 (2019) and Trucks: 11%
Future ADT: 5700 (In 2040 )
5TH ST over MAD CREEK (Route: 0)
Num:8421x
Open: no restriction [A]
Built: 2006, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 39.6 m = 129.9 ft
Main Spans: 3 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [05330]: Muscatine County [139], Iowa [19]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 71.7 metric ton = 78.9 tons (Load Factor(LF) [1])
Inventory: 42.9 metric ton = 47.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: Basically intolerable requiring high priority of corrrective action [3] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of relocation of road. [32]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4190 (2014) and Trucks: 0%
Future ADT: 4190 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.