Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 342.6 m = 1124.1 ft
Main Spans: 4 at 106.7 m = 350.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.8 m = 35.4 ft (2 Lanes) and Out-To-Out: 12 m = 39.4 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Tionesta [76864]: Forest County [053], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 1
TIONESTA TOWNSHIP
Condition
Deck: Good [7]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design: HL93 [A]
Operating: 43.4 metric ton = 47.7 tons (Unknown [F])
Inventory: 33.4 metric ton = 36.7 tons (Unknown [F])
Appraisal
Structural: Superior to present desirable criteria [9]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 4.3 km = 2.7 mi
Traffic
ADT: 1061 (2020) and Trucks: 5%
Future ADT: 1476 (In 2032
)