HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 1


COUNTY ROAD 75 over PIT RIVER (Route: 0)
Num: 03C0091x
Open: no restriction [A]
Built: 1919, Reconstructed: 1968
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Corrugated Steel [6] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 31.5 m = 103.4 ft
Main Spans: 1 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.5 m = 21.3 ft (2 Lanes) and Out-To-Out: 6.7 m = 22.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Modoc County [049], California [06]
Owned by County Highway Agency [02], DOT District: 2
0.3 MI SOUTH OF SR 299
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 30.1 metric ton = 33.1 tons (Load Factor(LF) [1])
Inventory: 17.8 metric ton = 19.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 202 (2012) and Trucks: 8%
Future ADT: 212 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.