Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 75 m = 246.1 ft
Main Spans: 6 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 18.5 m = 60.7 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cleveland [16000]: Cuyahoga County [035], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 12
N. OFF WOODLAND AVE-E 89
Condition
Deck: Poor [4]
Superstructure: Serious [3]
Substructure: Imminent Failure [1]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 0 metric ton = 0.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 0 metric ton = 0.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural:
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2016 [0316] and Frequency: 12
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 1070 (2021) and Trucks: 9%
Future ADT: 1485 (In 2041
)