Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 295.3 m = 968.9 ft
Main Spans: 8 at 36.1 m = 118.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 17.3 m = 56.8 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 4.4 m = 14.4 ft
Location
Middleton [49812]: Wood County [173], Ohio [39]
Owned by State Highway Agency [01], DOT District: 2
2.0 South of US 24
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design: HL93 [A]
Operating: 90.7 metric ton = 99.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22.7 metric ton = 25.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2020 [0220] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 1.8 km = 1.1 mi
Traffic
ADT: 11900 (2018) and Trucks: 3%
Future ADT: 15541 (In 2040
)