Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 42.7 m = 140.1 ft
Main Spans: 2 at 26.2 m = 86.0 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 15.2 m = 49.9 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Toledo [77000]: Lucas County [095], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 2
0.27 MI S OF SR2
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Excellent [9]
Loading
Design: HL93 [A]
Operating: 68 metric ton = 74.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 48.6 metric ton = 53.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10873 (2016) and Trucks: 3%
Future ADT: 15092 (In 2036
)