US 6 (MIDDLE BRG) over WATER ACUSHNET RIVER (Route: 6)
Num:F010023PHDOTNBIx
Open: no restriction [A]
Built: 1901, Reconstructed: 1996
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 118.9 m = 390.1 ft
Main Spans: 5 at 25.3 m = 83.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 21.7 m = 71.2 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fairhaven [22130]: Bristol County [005], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 5
.4 MI W OF NBED C.L.
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 54.2 metric ton = 59.6 tons (Load Factor(LF) [1])
Inventory: 32.5 metric ton = 35.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 19200 (2019) and Trucks: 6%
Future ADT: 28269 (In 2032 )
US 6 (DRAWBRIDGE) over WATER ACUSHNET RIVER (Route: 6)
Num:F010023PFDOTNBIx
Open: no restriction [A]
Built: 0, Reconstructed: 1997
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Swing [17]
Approach Span(s): Other [00]
Deck: Open Grating [3] with Wearing Surface:
Bridge Dimensions
Length: 86.3 m = 283.2 ft
Main Spans: 2 at 43.3 m = 142.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.3 m = 50.2 ft (4 Lanes) and Out-To-Out: 21.5 m = 70.5 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 5.58 m = 18.3 ft and Navigational Clearance: 1.8 m = 5.9 ft
Location
Fairhaven [22130]: Bristol County [005], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 5
.4 MI W OF NBED
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 56 metric ton = 61.6 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 19200 (2019) and Trucks: 6%
Future ADT: 28269 (In 2032 )
US 6 (WEST BRG) over COMB ACUS RIV/LOC ST/RR (Route: 6)
Num:F010023PJDOTNBIx
Open: no restriction [A]
Built: 1901, Reconstructed: 1962
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 178.3 m = 585.0 ft
Main Spans: 8 at 22.2 m = 72.8 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 21.2 m = 69.6 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fairhaven [22130]: Bristol County [005], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 5
.7 MI W OF NBED C.L.
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 38 metric ton = 41.8 tons (Load Factor(LF) [1])
Inventory: 22.8 metric ton = 25.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 19012 (2018) and Trucks: 5%
Future ADT: 28269 (In 2032 )
ST 18 NB RAMP ST 6 over HWY ELM ST (Route: 6)
Num:N06042B9WMUNNBIx
Open: no restriction [A]
Built: 2013, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 31.4 m = 103.0 ft
Main Spans: 1 at 26.7 m = 87.6 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 11.2 m = 36.7 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New Bedford [45000]: Bristol County [005], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 5
.1 MI SOUTH OF RT6
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 51.8 metric ton = 57.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 38.9 metric ton = 42.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 5200 (2019) and Trucks: 3%
Future ADT: 0 (In 0 )
US 6 EB over COMB ST18 & RELIEF (Route: 6)
Num:N060293NYDOTNBIx
Open: no restriction [A]
Built: 1973, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 61.3 m = 201.1 ft
Main Spans: 3 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 8.5 m = 27.9 ft (1 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New Bedford [45000]: Bristol County [005], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 5
.75 MI W OF FAIRHAVEN TL
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.5 metric ton = 65.5 tons (Load Factor(LF) [1])
Inventory: 35.7 metric ton = 39.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14000 (2017) and Trucks: 10%
Future ADT: 22110 (In 2032 )
US 6 WB over COMB ST18 & RELIEF (Route: 6)
Num:N060293P0DOTNBIx
Open: no restriction [A]
Built: 1973, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 76.8 m = 252.0 ft
Main Spans: 3 at 27.1 m = 88.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New Bedford [45000]: Bristol County [005], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 5
.75 M W OF FAIRHAVEN TL
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 61.1 metric ton = 67.2 tons (Load Factor(LF) [1])
Inventory: 36.6 metric ton = 40.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 20000 (2017) and Trucks: 10%
Future ADT: 28269 (In 2032 )
US 6 (EAST BRG) over WATER ACUSHNET RIVER (Route: 6)
Num:F010023PGDOTNBIx
Open: no restriction [A]
Built: 1901, Reconstructed: 1962
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 206 m = 675.9 ft
Main Spans: 9 at 22.9 m = 75.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.9 m = 52.2 ft (4 Lanes) and Out-To-Out: 21.7 m = 71.2 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fairhaven [22130]: Bristol County [005], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 5
AT NEW BEDFORD CITY LINE
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 53.9 metric ton = 59.3 tons (Load Factor(LF) [1])
Inventory: 32.3 metric ton = 35.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 21000 (2018) and Trucks: 5%
Future ADT: 28269 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.