BridgeSeek

Nearby Bridges in NBI 2021: 4


ROUTE 8 NORTHBOUND over BRANCH BROOK (Route: 8)
Num:1727x
Open: no restriction [A]
Built: 1964, Reconstructed: 1994
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 82.9 m = 272.0 ft
Main Spans: 3 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.3 m = 43.6 ft (2 Lanes) and Out-To-Out: 14.5 m = 47.6 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Watertown [80490]: Litchfield County [005], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 4
0.1 MILE SOUTH OF EXIT 38
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 95.7 metric ton = 105.3 tons (Load Factor(LF) [1])
Inventory: 57.4 metric ton = 63.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 16950 (2018) and Trucks: 6%
Future ADT: 25186 (In 2038 )
ROUTE 8 SOUTHBOUND over BRANCH BROOK (Route: 8)
Num:1728x
Open: no restriction [A]
Built: 1964, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 82.9 m = 272.0 ft
Main Spans: 3 at 27.1 m = 88.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12 m = 39.4 ft (2 Lanes) and Out-To-Out: 13.3 m = 43.6 ft for a 12 m = 39.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Watertown [80490]: Litchfield County [005], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 4
0.1 MILE SOUTH OF EXIT 38
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 27.5 metric ton = 30.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 21.1 metric ton = 23.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 16950 (2018) and Trucks: 6%
Future ADT: 25186 (In 2038 )
ROUTE 8 NORTHBOUND over REYNOLDS BRIDGE ROAD (Route: 8)
Num:1730x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18.5 m = 60.7 ft
Main Spans: 1 at 17.5 m = 57.4 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 14.5 m = 47.6 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Thomaston [75730]: Litchfield County [005], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 4
0.1 MI NORTH WATERTOWN TL
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 81.6 metric ton = 89.8 tons (Load Factor(LF) [1])
Inventory: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 16950 (2018) and Trucks: 6%
Future ADT: 25186 (In 2038 )
ROUTE 8 SOUTHBOUND over REYNOLDS BRIDGE ROAD (Route: 8)
Num:1729x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.5 m = 57.4 ft
Main Spans: 1 at 16.4 m = 53.8 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 13.3 m = 43.6 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Thomaston [75730]: Litchfield County [005], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 4
0.1 MI NORTH WATERTOWN TL
Condition
Deck: Poor [4]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 62.5 metric ton = 68.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 48 metric ton = 52.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 16950 (2018) and Trucks: 6%
Future ADT: 25186 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.