HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 2


WESTERN AVE over CAL SG CHNL&RR&BRDWY (Route: 0)
Num:16077700000000x
Open: no restriction [A]
Built: 1966, Reconstructed: 2020
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 342.3 m = 1123.1 ft
Main Spans: 1 at 74.9 m = 245.7 ft
Approach Spans: 13
Skew: 0
Width, Roadway: 16.2 m = 53.2 ft (4 Lanes) and Out-To-Out: 20.7 m = 67.9 ft for a 22.3 m = 73.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 13.7 m = 44.9 ft
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
1.5 M N IL 83
Condition
Deck: Serious [3]
Superstructure: Serious [3]
Substructure: Serious [3]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.4 metric ton = 59.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 12
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 6950 (2018) and Trucks: 10%
Future ADT: 8446 (In 2032 )
WESTERN AVE(GREGOR over VERMONT ST (Route: 0)
Num:16077600000000x
Open: no restriction [A]
Built: 1967, Reconstructed: 2008
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 24.7 m = 81.0 ft
Main Spans: 1 at 23.8 m = 78.1 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 16.3 m = 53.5 ft (3 Lanes) and Out-To-Out: 21.6 m = 70.9 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
JUST E WESTERN
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.9 metric ton = 92.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 50.2 metric ton = 55.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 5100 (2014) and Trucks: 3%
Future ADT: 8343 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider