Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Concrete [1] Arch - Deck [11]
Deck: Closed Grating [4] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 377.4 m = 1238.2 ft
Main Spans: 1 at 74.5 m = 244.4 ft
Approach Spans: 10
Skew: 0
Width, Roadway: 19.5 m = 64.0 ft (5 Lanes) and Out-To-Out: 25.5 m = 83.7 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 9.4 m = 30.8 ft
Location
Toledo [77000]: Lucas County [095], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 2
E. OF SUMMIT
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 74.5 metric ton = 82.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 45.4 metric ton = 49.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: October 2020 [1020] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 9536 (2015) and Trucks: 7%
Future ADT: 13236 (In 2035
)