Nearby Bridges in NBI 2021: 9


ASHLAND AVE over CAL SAG CHANNEL (Route: 0)
Num:16029400000000x
Open: no restriction [A]
Built: 1933, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 115.3 m = 378.3 ft
Main Spans: 1 at 76.2 m = 250.0 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (4 Lanes) and Out-To-Out: 19.3 m = 63.3 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 4.47 m = 14.7 ft and Navigational Clearance: 7.9 m = 25.9 ft
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
1 M S 127TH ST
Condition
Deck: Good [7]
Superstructure: Serious [3]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.1 metric ton = 61.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 33.4 metric ton = 36.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 12
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 18500 (2018) and Trucks: 6%
Future ADT: 16068 (In 2032 )
I- 57 SB over CAL SAG CHANNEL (Route: 57)
Num:16006400000000x
Open: no restriction [A]
Built: 1966, Reconstructed: 1989
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 149.9 m = 491.8 ft
Main Spans: 3 at 81.6 m = 267.7 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 16.6 m = 54.5 ft (3 Lanes) and Out-To-Out: 17.5 m = 57.4 ft for a 16.5 m = 54.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 12.8 m = 42.0 ft
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.5 M S 127TH
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 67.1 metric ton = 73.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 40.2 metric ton = 44.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 48200 (2020) and Trucks: 7%
Future ADT: 71379 (In 2032 )
I- 57 NB over CAL SAG CHANNEL (Route: 57)
Num:16006500000000x
Open: no restriction [A]
Built: 1966, Reconstructed: 1989
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 149.9 m = 491.8 ft
Main Spans: 3 at 81.6 m = 267.7 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 16.6 m = 54.5 ft (3 Lanes) and Out-To-Out: 17.7 m = 58.1 ft for a 17.7 m = 58.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 12.8 m = 42.0 ft
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.5 M S 127TH
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 67.1 metric ton = 73.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 40.2 metric ton = 44.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 48200 (2020) and Trucks: 7%
Future ADT: 71379 (In 2032 )
ASHLAND AVE over LITTLE CAL RIVER (Route: 0)
Num:16029500000000x
Open: no restriction [A]
Built: 1930, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 88.4 m = 290.0 ft
Main Spans: 5 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 18.3 m = 60.0 ft (4 Lanes) and Out-To-Out: 19.3 m = 63.3 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.5 N 138TH ST
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 74.5 metric ton = 82.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 44.7 metric ton = 49.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 1999 [199] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 18500 (2018) and Trucks: 6%
Future ADT: 16068 (In 2032 )
I- 57 NB over VERMONT ST (Route: 57)
Num:16006700000000x
Open: no restriction [A]
Built: 1966, Reconstructed: 2004
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 50.2 m = 164.7 ft
Main Spans: 3 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 16
Width, Roadway: 17.1 m = 56.1 ft (3 Lanes) and Out-To-Out: 18 m = 59.1 ft for a 18 m = 59.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
2.5 NE ILL 83
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 82.3 metric ton = 90.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 49.2 metric ton = 54.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 48200 (2020) and Trucks: 7%
Future ADT: 71379 (In 2032 )
I- 57 SB over VERMONT ST (Route: 57)
Num:16006600000000x
Open: no restriction [A]
Built: 1966, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 50.2 m = 164.7 ft
Main Spans: 3 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 16
Width, Roadway: 19.8 m = 65.0 ft (4 Lanes) and Out-To-Out: 20.7 m = 67.9 ft for a 19.8 m = 65.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
2.5 NE ILL 83
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.3 metric ton = 91.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 49.9 metric ton = 54.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 48200 (2020) and Trucks: 7%
Future ADT: 71379 (In 2032 )
127TH ST over I- 57 (Route: 0)
Num:16090900000000x
Open: no restriction [A]
Built: 1966, Reconstructed: 1994
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 66.8 m = 219.2 ft
Main Spans: 2 at 25 m = 82.0 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 27.4 m = 89.9 ft (7 Lanes) and Out-To-Out: 31.4 m = 103.0 ft for a 27.4 m = 89.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00805]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
4.1 M SW IL 1
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.6 metric ton = 65.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 36 metric ton = 39.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21800 (2018) and Trucks: 6%
Future ADT: 18540 (In 2032 )
I- 57 SB over LITTLE CAL RIV:BROAD (Route: 57)
Num:16006200000000x
Open: no restriction [A]
Built: 1967, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 503.5 m = 1652.0 ft
Main Spans: 20 at 36.6 m = 120.1 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 17.1 m = 56.1 ft (3 Lanes) and Out-To-Out: 18 m = 59.1 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.75 M S 127TH
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 59 metric ton = 64.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 35.3 metric ton = 38.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 48200 (2020) and Trucks: 7%
Future ADT: 71379 (In 2032 )
I- 57 NB over LITTLE CAL RIV:BROAD (Route: 57)
Num:16006300000000x
Open: no restriction [A]
Built: 1967, Reconstructed: 2003
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 503.5 m = 1652.0 ft
Main Spans: 20 at 36.6 m = 120.1 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 17.1 m = 56.1 ft (3 Lanes) and Out-To-Out: 18 m = 59.1 ft for a 17.7 m = 58.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00545]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.75 M S 127TH
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 59 metric ton = 64.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 35.3 metric ton = 38.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 48200 (2020) and Trucks: 7%
Future ADT: 71379 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider