IL 50/83 CICERO A over CAL SAG CHANNEL (Route: 50)
Num:16042100000000x
Open: no restriction [A]
Built: 1938, Reconstructed: 2012
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 115.5 m = 379.0 ft
Main Spans: 1 at 82.3 m = 270.0 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (4 Lanes) and Out-To-Out: 17.9 m = 58.7 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 7.3 m = 24.0 ft
Location
Unknown [00095]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.4 M S of 127th St
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 38.2 metric ton = 42.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 22.7 metric ton = 25.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 33800 (2019) and Trucks: 4%
Future ADT: 42333 (In 2032 )
127TH ST over I-294 (Route: 0)
Num:16090700000000x
Open: no restriction [A]
Built: 1958, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 118.8 m = 389.8 ft
Main Spans: 4 at 40.2 m = 131.9 ft
Approach Spans: 0
Skew: 53
Width, Roadway: 23.4 m = 76.8 ft (4 Lanes) and Out-To-Out: 35.4 m = 116.1 ft for a 23.4 m = 76.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00095]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.1 M E IL 50
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 58.3 metric ton = 64.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 35 metric ton = 38.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 27400 (2018) and Trucks: 11%
Future ADT: 14935 (In 2032 )
IL 50 (CICERO AVE over I-294 TRI STATE TOLL (Route: 50)
Num:16042000000000x
Open: no restriction [A]
Built: 1958, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 81.1 m = 266.1 ft
Main Spans: 4 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 36
Width, Roadway: 35.1 m = 115.2 ft (4 Lanes) and Out-To-Out: 39.8 m = 130.6 ft for a 35.1 m = 115.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00095]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.1 M N 127TH
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65.8 metric ton = 72.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 39.5 metric ton = 43.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 48700 (2019) and Trucks: 7%
Future ADT: 21270 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.