HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 2


EWING AVE(US-41) over CALUMET RIVER (Route: 41)
Num:16603700000000x
Open: no restriction [A]
Built: 1914, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Open Grating [3] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 103 m = 337.9 ft
Main Spans: 1 at 69.5 m = 228.0 ft
Approach Spans: 4
Skew: 0
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 17.2 m = 56.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 4.9 m = 16.1 ft
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 1
3331 E. 92ND STREET
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.7 metric ton = 48.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 26.2 metric ton = 28.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 11700 (2019) and Trucks: 5%
Future ADT: 8652 (In 2032 )
FAP-29 (95TH ST) over Calumet River (Route: 12)
Num:16603800000000x
Posted for load [P]
Built: 1958, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Open Grating [3] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 104.5 m = 342.9 ft
Main Spans: 1 at 72.7 m = 238.5 ft
Approach Spans: 4
Skew: 0
Width, Roadway: 18.9 m = 62.0 ft (4 Lanes) and Out-To-Out: 26.5 m = 86.9 ft for a 23.2 m = 76.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 6.1 m = 20.0 ft
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 1
3258 E.95TH STREET
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 28.8 metric ton = 31.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 17.5 metric ton = 19.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10000 (2019) and Trucks: 6%
Future ADT: 12154 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider