INTERSTATE-84 over CONNECTICUT RIVER (Route: 84)
Num: 00980Ax
Open: no restriction [A]
Built: 1906, Reconstructed: 1964
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 327.7 m = 1075.2 ft
Main Spans: 9 at 36.3 m = 119.1 ft
Approach Spans: 0
Skew: 11
Width, Roadway: 32.3 m = 106.0 ft (8 Lanes) and Out-To-Out: 36.8 m = 120.7 ft for a 32.3 m = 106.0 ft approaching roadway.
Vertical Clearance: 5.84 m = 19.2 ft and Navigational Clearance: 11.9 m = 39.0 ft
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
1 MI EAST OF I-91
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 89.8 metric ton = 98.8 tons ()
Inventory: 30.8 metric ton = 33.9 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 144200 (2018) and Trucks: 14%
Future ADT: 214267 (In 2038 )
I-84 TR 826 over CONNECTICUT RIVER (Route: 84)
Num: 00980Bx
Open: no restriction [A]
Built: 1964, Reconstructed: 2020
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 80.2 m = 263.1 ft
Main Spans: 2 at 37.5 m = 123.0 ft
Approach Spans: 1
Skew: 99
Width, Roadway: 6.4 m = 21.0 ft (1 Lanes) and Out-To-Out: 8.1 m = 26.6 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
EXIT 51 I-84 WB TO I-91NB
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65.4 metric ton = 71.9 tons (Load Factor(LF) [1])
Inventory: 39.2 metric ton = 43.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 15100 (2013) and Trucks: 14%
Future ADT: 22437 (In 2033 )
I-91 TR 840 over I-91 NB:US44 EB:RR:CT RV (Route: 91)
Num: 01428Dx
Open: no restriction [A]
Built: 1961, Reconstructed: 1990
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 124.4 m = 408.2 ft
Main Spans: 5 at 43.6 m = 143.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.6 m = 24.9 ft (1 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
ACCESS I-84EB FROM 1-91SB
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 40.8 metric ton = 44.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 31.4 metric ton = 34.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Basically intolerable requiring high priority of replacement [2]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 17000 (2018) and Trucks: 9%
Future ADT: 25260 (In 2038 )
I-84 & U.S. 44 over CONNECTICUT SOUTHERN RR (Route: 84)
Num:6046x
Open: no restriction [A]
Built: 1961, Reconstructed: 1990
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 11.9 m = 39.0 ft
Main Spans: 1 at 10.1 m = 33.1 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 39.1 m = 128.3 ft (7 Lanes) and Out-To-Out: 44.6 m = 146.3 ft for a 39 m = 128.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.1 MILE WEST OF CT RIVER
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.6 metric ton = 66.7 tons (Load Factor(LF) [1])
Inventory: 36.8 metric ton = 40.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 89900 (2018) and Trucks: 9%
Future ADT: 133582 (In 2038 )
US ROUTE 44 EB over I-91 NB:I-91 COL:SW RDWY (Route: 44)
Num:6049x
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 40.2 m = 131.9 ft
Main Spans: 2 at 14.6 m = 47.9 ft
Approach Spans: 1
Skew: 6
Width, Roadway: 9.3 m = 30.5 ft (2 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 4.34 m = 14.2 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
ACCESS 84EB FROM MORGANST
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.2 metric ton = 65.1 tons (Load Factor(LF) [1])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 11000 (2018) and Trucks: 6%
Future ADT: 16345 (In 2038 )
US ROUTE 44 WB over I-91 NB: C-D RDWY & RAMP (Route: 44)
Num:6048x
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 46.9 m = 153.9 ft
Main Spans: 2 at 17.1 m = 56.1 ft
Approach Spans: 1
Skew: 99
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 10.6 m = 34.8 ft for a 9.4 m = 30.8 ft approaching roadway.
Vertical Clearance: 5.28 m = 17.3 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
AT WEST END BULKELEY BRG
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 81.4 metric ton = 89.5 tons (Load Factor(LF) [1])
Inventory: 48.9 metric ton = 53.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 11000 (2018) and Trucks: 6%
Future ADT: 16345 (In 2038 )
INTERSTATE-91 SB over RAMP D&F:I-84:US RTE 44 (Route: 91)
Num: 01428Ax
Open: no restriction [A]
Built: 1961, Reconstructed: 1991
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 289.9 m = 951.2 ft
Main Spans: 13 at 24.1 m = 79.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12 m = 39.4 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 5.33 m = 17.5 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
APPROX 800'NORTH OF RTE 2
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 81.2 metric ton = 89.3 tons (Load Factor(LF) [1])
Inventory: 48.7 metric ton = 53.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 40250 (2015) and Trucks: 14%
Future ADT: 59807 (In 2035 )
W-N TURNING RDWY over I-84/91 RAMPS: CSO RR (Route: 84)
Num:5868x
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 526.2 m = 1726.5 ft
Main Spans: 9 at 68 m = 223.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 8.7 m = 28.5 ft (1 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
FLY-OVER
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 64.4 metric ton = 70.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 26200 (2018) and Trucks: 14%
Future ADT: 38931 (In 2038 )
I-91 RP 153 over PARKING AREA (Route: 91)
Num: 01686Ex
Open: no restriction [A]
Built: 1961, Reconstructed: 1991
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 88.1 m = 289.1 ft
Main Spans: 4 at 21.9 m = 71.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 7.8 m = 25.6 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
ACCESS I-91SB @ MORGAN ST
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 85.3 metric ton = 93.8 tons (Load Factor(LF) [1])
Inventory: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 18170 (2015) and Trucks: 9%
Future ADT: 26999 (In 2035 )
I-91 TR 839 over I-91-153:I-84-825:US44EB (Route: 91)
Num: 01428Bx
Open: no restriction [A]
Built: 1961, Reconstructed: 1991
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 234.4 m = 769.1 ft
Main Spans: 11 at 23.2 m = 76.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.4 m = 27.6 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
I-91 SB EXIT 31
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.6 metric ton = 77.7 tons (Load Factor(LF) [1])
Inventory: 42.3 metric ton = 46.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1200 (2019) and Trucks: 14%
Future ADT: 1783 (In 2039 )
ROUTE 2 over I-91 & CONN RV CT SO. RR (Route: 2)
Num: 00371Ax
Open: no restriction [A]
Built: 1958, Reconstructed: 1999
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 358.1 m = 1174.9 ft
Main Spans: 6 at 51.2 m = 168.0 ft
Approach Spans: 5
Skew: 6
Width, Roadway: 26.2 m = 86.0 ft (7 Lanes) and Out-To-Out: 34.1 m = 111.9 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 5.89 m = 19.3 ft and Navigational Clearance: 14 m = 45.9 ft
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
JCT ROUTE 2 & I-91
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.7 metric ton = 65.7 tons (Load Factor(LF) [1])
Inventory: 35.8 metric ton = 39.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 28300 (2018) and Trucks: 8%
Future ADT: 42051 (In 2038 )
I-84 TR 825 over US RT 44EB & COLUMBUS BD (Route: 84)
Num: 01686Bx
Open: no restriction [A]
Built: 1961, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 159.7 m = 524.0 ft
Main Spans: 8 at 26.2 m = 86.0 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 6.1 m = 20.0 ft (1 Lanes) and Out-To-Out: 7.8 m = 25.6 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 4.42 m = 14.5 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
I-84 EB EXIT NO. 51
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.1 metric ton = 65.0 tons (Load Factor(LF) [1])
Inventory: 35.5 metric ton = 39.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10800 (2014) and Trucks: 14%
Future ADT: 16048 (In 2034 )
INTERSTATE-84 over MARKET STREET & I-91 NB (Route: 84)
Num: 01686Ax
Open: no restriction [A]
Built: 1961, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 265.2 m = 870.1 ft
Main Spans: 14 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.3 m = 60.0 ft (4 Lanes) and Out-To-Out: 20.6 m = 67.6 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 4.5 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
EAST END I-91 & I-84 INT
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 82.9 metric ton = 91.2 tons (Load Factor(LF) [1])
Inventory: 50 metric ton = 55.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 99700 (2018) and Trucks: 14%
Future ADT: 148144 (In 2038 )
I-91 TR 841 over I-91 RAMP 186 (Route: 84)
Num:5921x
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 32.3 m = 106.0 ft
Main Spans: 1 at 30.8 m = 101.1 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 9.1 m = 29.9 ft (1 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
I-91 SB EXIT 32A TO 84 WB
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 93.2 metric ton = 102.5 tons (Load Factor(LF) [1])
Inventory: 55.9 metric ton = 61.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21500 (2018) and Trucks: 14%
Future ADT: 31947 (In 2038 )
ROUTE 2 over EAST RIVER DRIVE (Route: 2)
Num:372x
Open: no restriction [A]
Built: 1958, Reconstructed: 1997
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 29.3 m = 96.1 ft
Main Spans: 1 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 11
Width, Roadway: 25.9 m = 85.0 ft (7 Lanes) and Out-To-Out: 31.6 m = 103.7 ft for a 26.5 m = 86.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
1 MI EAST OF HARTFORD TL
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 73.4 metric ton = 80.7 tons (Load Factor(LF) [1])
Inventory: 44 metric ton = 48.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 28900 (2015) and Trucks: 6%
Future ADT: 42943 (In 2035 )
I-91 & TR 841 over CONNECTICUT SOUTHERN RR (Route: 91)
Num:1687x
Open: no restriction [A]
Built: 1950, Reconstructed: 1990
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 10.4 m = 34.1 ft
Approach Spans: 0
Skew: 71
Width, Roadway: 31.4 m = 103.0 ft (7 Lanes) and Out-To-Out: 35.1 m = 115.2 ft for a 31.4 m = 103.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
N ENTRANCE AT PED. BRIDGE
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 63.5 metric ton = 69.9 tons ()
Inventory: 40.8 metric ton = 44.9 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 66400 (2015) and Trucks: 12%
Future ADT: 98664 (In 2035 )
I-91 SOUTHBOUND AN over I-84 ACCESS RAMP 331 (Route: 91)
Num:6556x
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 23.8 m = 78.1 ft
Main Spans: 1 at 23.8 m = 78.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 22.6 m = 74.2 ft (4 Lanes) and Out-To-Out: 57 m = 187.0 ft for a 22.6 m = 74.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
400' SOUTH OF FOUNDERS BR
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.6 metric ton = 92.0 tons (Load Factor(LF) [1])
Inventory: 50.2 metric ton = 55.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 68750 (2015) and Trucks: 14%
Future ADT: 102156 (In 2035 )
I-91 & NB C-D RDWY over I-91 NORTHBOUND RAMP 188 (Route: 91)
Num:6555x
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 14.3 m = 46.9 ft
Main Spans: 1 at 14.3 m = 46.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 73.8 m = 242.1 ft (9 Lanes) and Out-To-Out: 94 m = 308.4 ft for a 73.8 m = 242.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
400' SOUTH OF FOUNDERS BR
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 93.7 metric ton = 103.1 tons (Load Factor(LF) [1])
Inventory: 56.1 metric ton = 61.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 92900 (2015) and Trucks: 14%
Future ADT: 138040 (In 2035 )
INTERSTATE-84 EB over US ROUTE 44 EASTBOUND (Route: 84)
Num:1858x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 16.8 m = 55.1 ft
Main Spans: 1 at 14.9 m = 48.9 ft
Approach Spans: 0
Skew: 36
Width, Roadway: 15.5 m = 50.9 ft (3 Lanes) and Out-To-Out: 17.2 m = 56.4 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.3 MI EAST OF HARTFORD TL
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 89.5 metric ton = 98.5 tons (Load Factor(LF) [1])
Inventory: 53.7 metric ton = 59.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 64550 (2018) and Trucks: 9%
Future ADT: 95915 (In 2038 )
I-84/91 TR841/858 over U.S. 44 WB & MARKET ST (Route: 91)
Num:5925x
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 64.3 m = 211.0 ft
Main Spans: 2 at 40.2 m = 131.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.3 m = 43.6 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
RAMPS FROM 91 NB&SB TO 84
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 76.9 metric ton = 84.6 tons (Load Factor(LF) [1])
Inventory: 46.2 metric ton = 50.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 38300 (2015) and Trucks: 14%
Future ADT: 56910 (In 2035 )
INTERSTATE-84 WB over US ROUTE 44 EASTBOUND (Route: 84)
Num:1859x
Open: no restriction [A]
Built: 1964, Reconstructed: 2000
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18 m = 59.1 ft
Main Spans: 1 at 16.2 m = 53.2 ft
Approach Spans: 0
Skew: 41
Width, Roadway: 19.5 m = 64.0 ft (4 Lanes) and Out-To-Out: 20.6 m = 67.6 ft for a 19.2 m = 63.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.3 MI EAST OF HARTFORD TL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.4 metric ton = 91.7 tons (Load Factor(LF) [1])
Inventory: 50.1 metric ton = 55.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 64550 (2018) and Trucks: 9%
Future ADT: 95915 (In 2038 )
INTERSTATE-91 over CONNECTICUT SOUTHERN RR (Route: 91)
Num:3277x
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 23.8 m = 78.1 ft
Main Spans: 1 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 32.3 m = 106.0 ft (7 Lanes) and Out-To-Out: 34.3 m = 112.5 ft for a 32.3 m = 106.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.3 MILE NORTH OF EXIT 29A
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 98 metric ton = 107.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 75400 (2015) and Trucks: 14%
Future ADT: 112037 (In 2035 )
I-84 EB & RAMP 196 over EAST RIVER DRIVE (Route: 84)
Num:2361x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.7 m = 67.9 ft
Main Spans: 1 at 19.2 m = 63.0 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 18.3 m = 60.0 ft (4 Lanes) and Out-To-Out: 20 m = 65.6 ft for a 18.6 m = 61.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.2 MI EAST OF HARTFORD TL
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 88.8 metric ton = 97.7 tons (Load Factor(LF) [1])
Inventory: 53.2 metric ton = 58.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 64750 (2018) and Trucks: 10%
Future ADT: 96212 (In 2038 )
I-91 SB & TR 835 over CONNECTICUT SOUTHERN RR (Route: 91)
Num:3622x
Open: no restriction [A]
Built: 1958, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 45.7 m = 149.9 ft
Main Spans: 18 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 80
Width, Roadway: 7.9 m = 25.9 ft (5 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
AT EXIT 29A
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.7 metric ton = 48.1 tons (Load Factor(LF) [1])
Inventory: 30.7 metric ton = 33.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Superior to present desirable criteria [9]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 37700 (2015) and Trucks: 14%
Future ADT: 56018 (In 2035 )
RTE 2 WB & I84-829 over DARLIN STREET (Route: 2)
Num:2365x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.4 m = 57.1 ft
Main Spans: 1 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 29.9 m = 98.1 ft (5 Lanes) and Out-To-Out: 31.6 m = 103.7 ft for a 29.9 m = 98.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.3 MI E OF HARTFORD TL
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 87.6 metric ton = 96.4 tons (Load Factor(LF) [1])
Inventory: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4900 (2018) and Trucks: 5%
Future ADT: 7281 (In 2038 )
I-84 WB & TR 827 over EAST RIVER DRIVE (Route: 84)
Num:2362x
Open: no restriction [A]
Built: 1964, Reconstructed: 1996
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 38.4 m = 126.0 ft
Main Spans: 1 at 36.9 m = 121.1 ft
Approach Spans: 0
Skew: 58
Width, Roadway: 22.9 m = 75.1 ft (4 Lanes) and Out-To-Out: 24.1 m = 79.1 ft for a 22.9 m = 75.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.4 MILE E OF HARTFORD TL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 65.4 metric ton = 71.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 53800 (2018) and Trucks: 10%
Future ADT: 79941 (In 2038 )
I-91 SB & I-91 TR over CONNECTICUT SOUTHERN RR (Route: 91)
Num:3621x
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 19.8 m = 65.0 ft
Main Spans: 1 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 72
Width, Roadway: 12.8 m = 42.0 ft (3 Lanes) and Out-To-Out: 90.4 m = 296.6 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
I-91 SB EXIT 29A
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 78 metric ton = 85.8 tons (Allowable Stress(AS) [2])
Inventory: 43.5 metric ton = 47.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 37700 (2015) and Trucks: 9%
Future ADT: 56018 (In 2035 )
ROUTE 2 EASTBOUND over DARLIN STREET (Route: 2)
Num:2364x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.4 m = 57.1 ft
Main Spans: 1 at 16 m = 52.5 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.3 MI E OF HARTFORD TL
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 61 metric ton = 67.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4900 (2018) and Trucks: 5%
Future ADT: 7281 (In 2038 )
I-84 TR 833 & RAMP over DARLIN STREET (Route: 84)
Num:2363x
Open: no restriction [A]
Built: 1963, Reconstructed: 1996
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18.3 m = 60.0 ft
Main Spans: 1 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 19
Width, Roadway: 16.8 m = 55.1 ft (3 Lanes) and Out-To-Out: 17.8 m = 58.4 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.3 MI E OF FOUNDERS BRDG
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 76.7 metric ton = 84.4 tons (Load Factor(LF) [1])
Inventory: 46.1 metric ton = 50.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 9200 (2019) and Trucks: 9%
Future ADT: 13670 (In 2039 )
US 44 EB & MAIN ST over I-84 & MORGAN ST RAMP (Route: 44)
Num:1426x
Open: no restriction [A]
Built: 1963, Reconstructed: 1987
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 62.5 m = 205.1 ft
Main Spans: 2 at 33.8 m = 110.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 23.1 m = 75.8 ft (6 Lanes) and Out-To-Out: 32.8 m = 107.6 ft for a 22.9 m = 75.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.29MI EAST OF HIGH ST INT
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.4 metric ton = 66.4 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 18000 (2018) and Trucks: 6%
Future ADT: 26746 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.