Nearby Bridges in NBI 2021: 4


Canton St over Fall Brook (Route: 14)
Num:54100x
Open: no restriction [A]
Built: 2018, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 11.3 m = 37.1 ft
Main Spans: 1 at 10.1 m = 33.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Troy [77584]: Bradford County [015], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 3
TROY BORO
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 55.1 metric ton = 60.6 tons (Unknown [F])
Inventory: 42.4 metric ton = 46.6 tons (Unknown [F])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 6.8 km = 4.2 mi
Traffic
ADT: 6279 (2019) and Trucks: 6%
Future ADT: 8086 (In 2037 )
EUREKA DRIVE-TROY over SOUTH FORK SUGAR CREEK (Route: 0)
Num:6699x
Open: no restriction [A]
Built: 1963, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Open Grating [3] with Wearing Surface:
Bridge Dimensions
Length: 10.7 m = 35.1 ft
Main Spans: 1 at 9.8 m = 32.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7 m = 23.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Troy [77584]: Bradford County [015], Pennsylvania [42]
Owned by Town or Township Highway Agency [03], DOT District: 3
EUREKA DR.:TROY BORO.
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 499 (2019) and Trucks: 25%
Future ADT: 940 (In 2041 )
PROSPECT-TROY BORO over FALL BROOK (Route: 0)
Num:6701x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 11 m = 36.1 ft
Main Spans: 1 at 10.4 m = 34.1 ft
Approach Spans: 0
Skew: 26
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 5.2 m = 17.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Troy [77584]: Bradford County [015], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 3
PROSPECT ST: TROY BORO
Condition
Deck: Serious [3]
Superstructure: Serious [3]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 200 (2020) and Trucks: 0%
Future ADT: 309 (In 2042 )
S. RAILROAD ST over SOUTH FORK SUGAR CREEK (Route: 0)
Num:6704x
Open: no restriction [A]
Built: 1948, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.1 m = 43.0 ft
Main Spans: 1 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.3 m = 17.4 ft (2 Lanes) and Out-To-Out: 6.8 m = 22.3 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Troy [77584]: Bradford County [015], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 3
S. RAILROAD ST. TROY BORO
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 54.4 metric ton = 59.8 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 100 (2019) and Trucks: 0%
Future ADT: 155 (In 2041 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.