HINCKLEY RD over W BR BIG ROCK CREEK (Route: 0)
Num:19541500000000x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 23.2 m = 76.1 ft
Main Spans: 2 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 9.2 m = 30.2 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: DeKalb County [037], Illinois [17]
Owned by Town or Township Highway Agency [03], DOT District: 3
1015N 1600E
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 40.5 metric ton = 44.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 24.3 metric ton = 26.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 950 (2017) and Trucks: 8%
Future ADT: 1145 (In 2032 )
PHILLIPS ROAD over BIG ROCK CREEK (Route: 0)
Num:19542500000000x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 20.1 m = 65.9 ft
Main Spans: 1 at 18.9 m = 62.0 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: DeKalb County [037], Illinois [17]
Owned by Town or Township Highway Agency [03], DOT District: 3
1070N 1615E
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [D])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [D])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: April 1999 [499] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 550 (2017) and Trucks: 0%
Future ADT: 121 (In 2032 )
HINCKLEY ROAD over BATTLE CREEK (Route: 0)
Num:19542000000000x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Channel beam [22]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 21 m = 68.9 ft
Main Spans: 2 at 10.1 m = 33.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: DeKalb County [037], Illinois [17]
Owned by Town or Township Highway Agency [03], DOT District: 3
1140N 1600F
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.3 metric ton = 66.3 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Inventory: 38.9 metric ton = 42.8 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 950 (2017) and Trucks: 8%
Future ADT: 1145 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.