Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 14 m = 45.9 ft
Main Spans: 1 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 9.7 m = 31.8 ft (2 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fremont [27573]: Sullivan County [105], New York [36]
Owned by State Highway Agency [01], DOT District: 96
50 MI NW JCT RTS 97 + 17B
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 64.4 metric ton = 70.8 tons ()
Inventory: 17.1 metric ton = 18.8 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 852 (2018) and Trucks: 16%
Future ADT: 888 (In 2039
)