HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 10


MAIN STREET over TANKERHOOSEN RIVER (Route: 0)
Num:4575x
Open: no restriction [A]
Built: 1885, Reconstructed: 1995
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Corrugated Steel [6] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 21 m = 68.9 ft
Main Spans: 1 at 20.7 m = 67.9 ft
Approach Spans: 0
Skew: 16
Width, Roadway: 4.7 m = 15.4 ft (1 Lanes) and Out-To-Out: 4.7 m = 15.4 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by Town or Township Highway Agency [03], DOT District: 1
0.4 MILE FROM ROUTE 83
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 60.5 metric ton = 66.6 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 21 (2020) and Trucks: 1%
Future ADT: 31 (In 2040 )
INTERSTATE-84 EB over ROUTE 30 & 83 (OVERLAP) (Route: 84)
Num:5230x
Open: no restriction [A]
Built: 1982, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 54.4 m = 178.5 ft
Main Spans: 1 at 51.8 m = 170.0 ft
Approach Spans: 0
Skew: 47
Width, Roadway: 29.9 m = 98.1 ft (6 Lanes) and Out-To-Out: 31 m = 101.7 ft for a 29.9 m = 98.1 ft approaching roadway.
Vertical Clearance: 5.69 m = 18.7 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.4 MI E OF MANCHESTER TL
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 84.1 metric ton = 92.5 tons (Load Factor(LF) [1])
Inventory: 50.4 metric ton = 55.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 52950 (2018) and Trucks: 14%
Future ADT: 78678 (In 2038 )
INTERSTATE-84 WB over ROUTE 30 & 83 (OVERLAP) (Route: 84)
Num:5231x
Open: no restriction [A]
Built: 1982, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 54.6 m = 179.1 ft
Main Spans: 1 at 51.8 m = 170.0 ft
Approach Spans: 0
Skew: 47
Width, Roadway: 26.2 m = 86.0 ft (5 Lanes) and Out-To-Out: 27.4 m = 89.9 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.6 MI WEST OF DOBSON RD
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 84.7 metric ton = 93.2 tons (Load Factor(LF) [1])
Inventory: 50.9 metric ton = 56.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 47700 (2018) and Trucks: 9%
Future ADT: 70877 (In 2038 )
I-84 WB OFF RAMP over I-84 WB RAMP FROM 30/83 (Route: 84)
Num:5236x
Open: no restriction [A]
Built: 1982, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 38.9 m = 127.6 ft
Main Spans: 1 at 37.2 m = 122.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.3 m = 24.0 ft (1 Lanes) and Out-To-Out: 8.5 m = 27.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
I-84 WB EXIT NO. 64
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 65.7 metric ton = 72.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2880 (2020) and Trucks: 9%
Future ADT: 4279 (In 2040 )
ROUTE 30 & 83 over TANKERHOOSEN RIVER (Route: 30)
Num:5239x
Open: no restriction [A]
Built: 1932, Reconstructed: 1981
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.8 m = 32.2 ft
Main Spans: 3 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.9 m = 52.2 ft (4 Lanes) and Out-To-Out: 20.9 m = 68.6 ft for a 15.9 m = 52.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.3 MI E OF MANCHESTER TL
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 13.6 metric ton = 15.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 10.7 metric ton = 11.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 19300 (2017) and Trucks: 4%
Future ADT: 28678 (In 2037 )
I-84 RAMP #253 over INTERSTATE-84 (Route: 84)
Num:5232x
Open: no restriction [A]
Built: 1982, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 125.3 m = 411.1 ft
Main Spans: 2 at 64 m = 210.0 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 16.5 m = 54.1 ft (3 Lanes) and Out-To-Out: 17.6 m = 57.7 ft for a 16.5 m = 54.1 ft approaching roadway.
Vertical Clearance: 6.91 m = 22.7 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.63 MI E OF MANCHESTER TL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 12600 (2019) and Trucks: 14%
Future ADT: 18722 (In 2039 )
KELLY ROAD over HOCKANUM RIVER (Route: 0)
Num:5240x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 32.3 m = 106.0 ft
Main Spans: 1 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 15.9 m = 52.2 ft (4 Lanes) and Out-To-Out: 21.2 m = 69.6 ft for a 15.9 m = 52.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by Town or Township Highway Agency [03], DOT District: 1
0.3 MILES WEST OF RT.83
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 77.8 metric ton = 85.6 tons (Load Factor(LF) [1])
Inventory: 46.6 metric ton = 51.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 6789 (2019) and Trucks: 4%
Future ADT: 10088 (In 2039 )
I-84 EB & RAMP 061 over HOCKANUM RIVER (Route: 84)
Num:5228x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37 m = 121.4 ft
Main Spans: 1 at 35.4 m = 116.1 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 44.1 m = 144.7 ft (6 Lanes) and Out-To-Out: 45.6 m = 149.6 ft for a 44.2 m = 145.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.25 MILE WEST OF EXIT 64
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.6 metric ton = 66.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 46.7 metric ton = 51.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 52950 (2018) and Trucks: 14%
Future ADT: 78678 (In 2038 )
I-84 EB OFF RAMP over ROUTE 30 (HARTFORD TPKE) (Route: 84)
Num:5237x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 35.1 m = 115.2 ft
Main Spans: 1 at 33.5 m = 109.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
EXIT 64
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 81.3 metric ton = 89.4 tons (Load Factor(LF) [1])
Inventory: 48.6 metric ton = 53.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8000 (2018) and Trucks: 9%
Future ADT: 11887 (In 2038 )
I-84 WB & RAMPS over HOCKANUM RIVER (Route: 84)
Num:5229x
Open: no restriction [A]
Built: 1982, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.2 m = 122.1 ft
Main Spans: 1 at 35.4 m = 116.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 46.2 m = 151.6 ft (6 Lanes) and Out-To-Out: 50.2 m = 164.7 ft for a 46 m = 150.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vernon [78250]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.1 MILE E OF S.WINDSOR TL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 62.5 metric ton = 68.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 48.3 metric ton = 53.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 52950 (2018) and Trucks: 14%
Future ADT: 78678 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.