HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 9


I-195 WB over SEEKONK RIVER (Route: 195)
Num:7000x
Open: no restriction [A]
Built: 1969, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 580.3 m = 1904.0 ft
Main Spans: 1 at 39.8 m = 130.6 ft
Approach Spans: 20
Skew: 0
Width, Roadway: 21.9 m = 71.9 ft (5 Lanes) and Out-To-Out: 23.3 m = 76.4 ft for a 18.6 m = 61.0 ft approaching roadway.
Vertical Clearance: 5.59 m = 18.3 ft and Navigational Clearance: 12.8 m = 42.0 ft
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
0.2 Mi W of JCT US 6
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 42.1 metric ton = 46.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 32.4 metric ton = 35.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 80500 (2021) and Trucks: 19%
Future ADT: 88550 (In 2041 )
I-195 EB over SEEKONK RVR & STS (Route: 195)
Num:2000x
Open: no restriction [A]
Built: 1930, Reconstructed: 2008
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 509.3 m = 1671.0 ft
Main Spans: 14 at 48.9 m = 160.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 20.7 m = 67.9 ft (5 Lanes) and Out-To-Out: 21.8 m = 71.5 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 5.18 m = 17.0 ft and Navigational Clearance: 12.5 m = 41.0 ft
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
1.0 Mi E of JCT I-95&195
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 31.8 metric ton = 35.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 24.3 metric ton = 26.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 81000 (2021) and Trucks: 13%
Future ADT: 89100 (In 2041 )
I-195 EB RAMP CR-1 over VALLEY ST (Route: 195)
Num:4620x
Open: no restriction [A]
Built: 1959, Reconstructed: 2008
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 13.5 m = 44.3 ft
Main Spans: 1 at 12.3 m = 40.4 ft
Approach Spans: 0
Skew: 26
Width, Roadway: 37.8 m = 124.0 ft (6 Lanes) and Out-To-Out: 46.5 m = 152.6 ft for a 37.8 m = 124.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
1.4 Mi W of JCT RI 114
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 97.2 metric ton = 106.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 90.4 metric ton = 99.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 21600 (2008) and Trucks: 10%
Future ADT: 25920 (In 2036 )
TAUNTON AV RAMP over I-195 EB & WB (Route: 44)
Num:4630x
Open: no restriction [A]
Built: 2005, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 116.1 m = 380.9 ft
Main Spans: 3 at 53.6 m = 175.9 ft
Approach Spans: 0
Skew: 2
Width, Roadway: 8.5 m = 27.9 ft (1 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
1.0 Mi W of JCT RI 114
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 50.2 metric ton = 55.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 38.9 metric ton = 42.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 15000 (2008) and Trucks: 10%
Future ADT: 18000 (In 2036 )
WATERMAN AV over P&W RR R.O.W. (Route: 0)
Num:9460x
Posted for load [P]
Built: 1994, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 15.2 m = 49.9 ft
Main Spans: 1 at 14.6 m = 47.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
0.1 Mi N of Waterfrt Dr
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 13.5 / H 15 [2]
Operating: 30.1 metric ton = 33.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22 metric ton = 24.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 200 (2008) and Trucks: 10%
Future ADT: 240 (In 2036 )
I-195 RAMP CR-3 over US 6 WARREN AV (Route: 195)
Num:4640x
Open: no restriction [A]
Built: 2013, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 36.3 m = 119.1 ft
Main Spans: 3 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 8.2 m = 26.9 ft (1 Lanes) and Out-To-Out: 9 m = 29.5 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
400ft S.of Jct RI 403
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 80.7 metric ton = 88.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 61.7 metric ton = 67.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 3600 (2011) and Trucks: 5%
Future ADT: 4320 (In 2036 )
US 6 WRRN AV & RMP over I-195 EB & WB (Route: 195)
Num:4665x
Open: no restriction [A]
Built: 2018, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 48.2 m = 158.1 ft
Main Spans: 2 at 24.4 m = 80.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 8.4 m = 27.6 ft (1 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 8.4 m = 27.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
0.5 Mi W of JCT RI 114
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 70 metric ton = 77.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 39.9 metric ton = 43.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5000 (2008) and Trucks: 10%
Future ADT: 6000 (In 2036 )
I-195 RAMP DR-2 over US 6 WARREN AV (Route: 195)
Num:4650x
Open: no restriction [A]
Built: 1959, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 27.4 m = 89.9 ft
Main Spans: 1 at 25.6 m = 84.0 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 7 m = 23.0 ft (1 Lanes) and Out-To-Out: 8.1 m = 26.6 ft for a 7 m = 23.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
0.1 Mi E of SEEKONK RVR
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.7 metric ton = 62.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 43.7 metric ton = 48.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 11600 (2008) and Trucks: 10%
Future ADT: 13920 (In 2036 )
POTTER ST over I-195 EB & WB (Route: 0)
Num:4670x
Posted for load [P]
Built: 1959, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 54.3 m = 178.2 ft
Main Spans: 2 at 19 m = 62.3 ft
Approach Spans: 2
Skew: 5
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Providence [22960]: Providence County [007], Rhode Island [44]
Owned by State Highway Agency [01], DOT District: 3
0.2 Mi N of JCT US 6
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 19.1 metric ton = 21.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 14.9 metric ton = 16.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 2000 (2008) and Trucks: 10%
Future ADT: 2400 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.