Bridge Type
Main Span(s): Prestressed concrete continuous [6] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 50.6 m = 166.0 ft
Main Spans: 3 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 32
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 14.1 m = 46.3 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Burt County [021], Nebraska [31]
Owned by State Highway Agency [01], DOT District: 3
0W OAKLAND
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 86 metric ton = 94.6 tons (Load Factor(LF) [1])
Inventory: 51 metric ton = 56.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 48
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 3 km = 1.9 mi
Traffic
ADT: 1615 (2018) and Trucks: 21%
Future ADT: 2423 (In 2038
)