Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 44.2 m = 145.0 ft
Main Spans: 3 at 16.8 m = 55.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 9.2 m = 30.2 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Lee County [103], Illinois [17]
Owned by County Highway Agency [02], DOT District: 2
SW EDGE FRANKLIN GRO
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 48.6 metric ton = 53.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 29.2 metric ton = 32.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 600 (2017) and Trucks: 12%
Future ADT: 800 (In 2040
)