Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 32.9 m = 107.9 ft
Main Spans: 1 at 32.3 m = 106.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 7.7 m = 25.3 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cambridge [10904]: Crawford County [039], Pennsylvania [42]
Owned by County Highway Agency [02], DOT District: 1
2.5 mi N Cambridge Spring
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 67.7 metric ton = 74.5 tons (Unknown [F])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [F])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 250 (2018) and Trucks: 1%
Future ADT: 250 (In 2038
)