HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


W MAUMEE STREET over S BR RAISIN RIVER (Route: 2017)
Num:5515x
Open: no restriction [A]
Built: 1919, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 22.5 m = 73.8 ft
Main Spans: 1 at 22.5 m = 73.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (4 Lanes) and Out-To-Out: 18.4 m = 60.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Adrian [00440]: Lenawee County [091], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 6
IN ADRIAN (OLD US-223 BR)
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 88.8 metric ton = 97.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 53.1 metric ton = 58.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 9323 (2007) and Trucks: 2%
Future ADT: 13464 (In 2018 )
US-223 BR over S BR RAISIN RIVER (Route: 223)
Num:12652x
Open: no restriction [A]
Built: 1934, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 21 m = 68.9 ft
Main Spans: 1 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.1 m = 43.0 ft (2 Lanes) and Out-To-Out: 17 m = 55.8 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Adrian [00440]: Lenawee County [091], Michigan [26]
Owned by State Highway Agency [01], DOT District: 6
IN ADRIAN (CHURCH STREET)
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 79.7 metric ton = 87.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 48.6 metric ton = 53.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 7560 (2006) and Trucks: 10%
Future ADT: 8694 (In 2026 )
COLLEGE AVENUE over S BRANCH RAISIN RIVER (Route: 2017)
Num:5715x
Open: no restriction [A]
Built: 1947, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 21 m = 68.9 ft
Main Spans: 1 at 20 m = 65.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.1 m = 43.0 ft (4 Lanes) and Out-To-Out: 17 m = 55.8 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Adrian [00440]: Lenawee County [091], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 6
IN ADRIAN
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 60 metric ton = 66.0 tons (Load Factor(LF) [1])
Inventory: 35.8 metric ton = 39.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 1800 (2006) and Trucks: 3%
Future ADT: 2070 (In 2026 )
MAPLE AVENUE over S BRANCH RAISIN RIVER (Route: 2017)
Num:5716x
Posted for load [P]
Built: 1947, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 21 m = 68.9 ft
Main Spans: 1 at 20 m = 65.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11 m = 36.1 ft (4 Lanes) and Out-To-Out: 15 m = 49.2 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Adrian [00440]: Lenawee County [091], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 6
IN ADRIAN
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 51.5 metric ton = 56.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8650 (2004) and Trucks: 5%
Future ADT: 9948 (In 2024 )
MICHIGAN AVENUE over S BRANCH RIVER RAISIN (Route: 2017)
Num:5714x
Open: no restriction [A]
Built: 1949, Reconstructed: 2000
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 23 m = 75.5 ft
Main Spans: 1 at 22 m = 72.2 ft
Approach Spans: 0
Skew: 23
Width, Roadway: 13.1 m = 43.0 ft (4 Lanes) and Out-To-Out: 17 m = 55.8 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Adrian [00440]: Lenawee County [091], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 6
IN ADRIAN
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 71.3 metric ton = 78.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 42.4 metric ton = 46.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 3800 (2006) and Trucks: 3%
Future ADT: 4370 (In 2026 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider