HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


FULLERTON PARKWAY over LINCOLN PK LAGOON (Route: 0)
Num:16627300000000x
Open: no restriction [A]
Built: 2012, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 37.6 m = 123.4 ft
Main Spans: 1 at 35.8 m = 117.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.7 m = 61.4 ft (5 Lanes) and Out-To-Out: 25.8 m = 84.6 ft for a 18.7 m = 61.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 1
2400 N. & 100 E.
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 42.1 metric ton = 46.3 tons (Unknown [F])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [F])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 29900 (2018) and Trucks: 9%
Future ADT: 26300 (In 2037 )
FAP-307 (LaSalle D over SHARED USE PATH (Route: 64)
Num:16970400000000x
Open: no restriction [A]
Built: 1938, Reconstructed: 2011
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 9.2 m = 30.2 ft
Main Spans: 1 at 8.6 m = 28.2 ft
Approach Spans: 0
Skew: 26
Width, Roadway: 24.1 m = 79.1 ft (7 Lanes) and Out-To-Out: 36.8 m = 120.7 ft for a 24.1 m = 79.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 1
1677 N 8 W
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 46 metric ton = 50.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 27.5 metric ton = 30.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 27100 (2019) and Trucks: 4%
Future ADT: 23793 (In 2032 )
LAKE SHORE DRIVE over FULLERTON AVENUE (Route: 41)
Num:16618800000000x
Open: no restriction [A]
Built: 1940, Reconstructed: 1992
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 22.2 m = 72.8 ft
Main Spans: 1 at 20.1 m = 65.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 29.9 m = 98.1 ft (8 Lanes) and Out-To-Out: 32.2 m = 105.6 ft for a 29.9 m = 98.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 1
2400N 100W
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 39.5 metric ton = 43.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 23.7 metric ton = 26.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 94900 (2020) and Trucks: 2%
Future ADT: 182619 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider