Nearby Bridges in NBI 2021: 7


I- 94 EB EDENS over I- 90 JFK & CTA (Route: 94)
Num:16257400000000x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 109.7 m = 359.9 ft
Main Spans: 2 at 58.7 m = 192.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.7 m = 58.1 ft (6 Lanes) and Out-To-Out: 18.7 m = 61.4 ft for a 17.7 m = 58.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
JUST W OF WILSON
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 56.4 metric ton = 62.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 33.7 metric ton = 37.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 111700 (2020) and Trucks: 7%
Future ADT: 123497 (In 2032 )
IL 50 (CICERO AVE over I- 90 JFK & CTA (Route: 50)
Num:16040000000000x
Open: no restriction [A]
Built: 1958, Reconstructed: 1997
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 67.2 m = 220.5 ft
Main Spans: 3 at 25.2 m = 82.7 ft
Approach Spans: 0
Skew: 44
Width, Roadway: 17.6 m = 57.7 ft (4 Lanes) and Out-To-Out: 24.4 m = 80.1 ft for a 17.4 m = 57.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
AT WILSON
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 57.3 metric ton = 63.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 34.3 metric ton = 37.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 19100 (2019) and Trucks: 7%
Future ADT: 29973 (In 2032 )
I- 94 SB EDENS over I- 90 WB JFK & CTA (Route: 94)
Num:16011000000000x
Open: no restriction [A]
Built: 1957, Reconstructed: 1994
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 108.2 m = 355.0 ft
Main Spans: 3 at 39.2 m = 128.6 ft
Approach Spans: 0
Skew: 29
Width, Roadway: 8.5 m = 27.9 ft (3 Lanes) and Out-To-Out: 9.5 m = 31.2 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
AT MONTROSE
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 74.5 metric ton = 82.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 44.7 metric ton = 49.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 55850 (2020) and Trucks: 7%
Future ADT: 61749 (In 2032 )
WILSON RMP TO EB I over I- 90 JFK & CTA (Route: 0)
Num:16259400000000x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 82.6 m = 271.0 ft
Main Spans: 2 at 43.7 m = 143.4 ft
Approach Spans: 0
Skew: 34
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 7.7 m = 25.3 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
SOUTH END OF EDENS
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design:
Operating: 80 metric ton = 88.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 47.6 metric ton = 52.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 8400 (2020) and Trucks: 0%
Future ADT: 1545 (In 2032 )
MONTROSE AVE over I- 90:94 JFK (Route: 0)
Num:16085200000000x
Open: no restriction [A]
Built: 1957, Reconstructed: 2020
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 142.2 m = 466.6 ft
Main Spans: 3 at 49.4 m = 162.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.6 m = 61.0 ft (5 Lanes) and Out-To-Out: 24.7 m = 81.0 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
5.4 M NW IL 64
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 32.1 metric ton = 35.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 19.1 metric ton = 21.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 15900 (2018) and Trucks: 6%
Future ADT: 18643 (In 2032 )
WILSON AVE over I- 94 EDENS (Route: 0)
Num:16203800000000x
Open: no restriction [A]
Built: 1957, Reconstructed: 1982
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 85.6 m = 280.9 ft
Main Spans: 3 at 25 m = 82.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 20.4 m = 66.9 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.1 M N I-90 JFK
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 66.7 metric ton = 73.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 40.2 metric ton = 44.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 5000 (1997) and Trucks: 3%
Future ADT: 5159 (In 2032 )
LAWRENCE AVE over I- 94 EDENS (Route: 0)
Num:16083900000000x
Open: no restriction [A]
Built: 1957, Reconstructed: 1980
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 61.7 m = 202.4 ft
Main Spans: 4 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 21.2 m = 69.6 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01051]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.3 M N I-94
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 53.5 metric ton = 58.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.1 metric ton = 35.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 18200 (2018) and Trucks: 5%
Future ADT: 15450 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.