Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7.9 m = 25.9 ft
Main Spans: 2 at 3.6 m = 11.8 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 5.8 m = 19.0 ft (2 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 7 m = 23.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Milan [53900]: Monroe County [115], Michigan [26]
Owned by County Highway Agency [02], DOT District: 6
.35 MI E OF LENAWEE CO LI
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 39.9 metric ton = 43.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 24 metric ton = 26.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 290 (2016) and Trucks: 3%
Future ADT: 334 (In 2036
)