Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 14 m = 45.9 ft
Main Spans: 1 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 37
Width, Roadway: 5.2 m = 17.1 ft (2 Lanes) and Out-To-Out: 6.1 m = 20.0 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Wayne [84920]: Cass County [027], Michigan [26]
Owned by County Highway Agency [02], DOT District: 5
1 MI E OF M-51
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Serious [3]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 21.1 metric ton = 23.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 12.6 metric ton = 13.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: October 2020 [1020] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 480 (2004) and Trucks: 0%
Future ADT: 710 (In 2024
)