HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


US 14 (MINER ST) over DES PLAINES RIVER (Route: 14)
Num:16023800000000x
Open: no restriction [A]
Built: 1925, Reconstructed: 1986
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 40.5 m = 132.9 ft
Main Spans: 2 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18 m = 59.1 ft (4 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Anderson [01460]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.7 M W I-294
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86.5 metric ton = 95.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 47.6 metric ton = 52.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 1600 (2017) and Trucks: 16%
Future ADT: 17922 (In 2032 )
RAND RD over DES PLAINES RIVER (Route: 0)
Num:16036200000000x
Open: no restriction [A]
Built: 1928, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 49.1 m = 161.1 ft
Main Spans: 3 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 13.4 m = 44.0 ft (4 Lanes) and Out-To-Out: 17.4 m = 57.1 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Anderson [01460]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.5 M NW DEMPSTER RD
Condition
Deck: Poor [4]
Superstructure: Serious [3]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 46 metric ton = 50.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 27.9 metric ton = 30.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2021 [0121] and Frequency: 12
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 26400 (2018) and Trucks: 5%
Future ADT: 28943 (In 2032 )
BUSSE HIGHWAY over PRAIRE CREEK (Route: 0)
Num:16023900000000x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 8.2 m = 26.9 ft
Main Spans: 1 at 7.9 m = 25.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 17.1 m = 56.1 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Anderson [01460]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.4 M SE US 14
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 89.1 metric ton = 98.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 60.6 metric ton = 66.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 1550 (2017) and Trucks: 17%
Future ADT: 17922 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.