Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 45.4 m = 149.0 ft
Main Spans: 3 at 14.9 m = 48.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Kirkwood [39837]: Broome County [007], New York [36]
Owned by State Highway Agency [01], DOT District: 91
JCT US 11 & I81 - EXIT 1
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 79.8 metric ton = 87.8 tons (Load Factor(LF) [1])
Inventory: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1.2 km = 0.7 mi
Traffic
ADT: 7384 (2018) and Trucks: 15%
Future ADT: 8970 (In 2039
)