HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


I 395 NB over HWY MEMORIAL BEACH RD (Route: 395)
Num:W120251QJDOTNBIx
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 25.3 m = 83.0 ft
Main Spans: 1 at 23.8 m = 78.1 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 12.4 m = 40.7 ft (2 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 12.5 m = 41.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Webster [73895]: Worcester County [027], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 3
200 FT E OF RT 193
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 56.5 metric ton = 62.2 tons (Load Factor(LF) [1])
Inventory: 33.8 metric ton = 37.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14626 (2016) and Trucks: 15%
Future ADT: 28427 (In 2032 )
I 395 SB over HWY MEMORIAL BEACH RD (Route: 395)
Num:W120251QKDOTNBIx
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 25.3 m = 83.0 ft
Main Spans: 1 at 23.8 m = 78.1 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 12.4 m = 40.7 ft (2 Lanes) and Out-To-Out: 13.7 m = 44.9 ft for a 12.5 m = 41.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Webster [73895]: Worcester County [027], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 3
300 FT. EAST OF ST-193
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 56.3 metric ton = 61.9 tons (Load Factor(LF) [1])
Inventory: 33.8 metric ton = 37.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14450 (2015) and Trucks: 15%
Future ADT: 28427 (In 2032 )
I 395 SB over ST 16 GORE RD (Route: 395)
Num:W120261QMDOTNBIx
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 28.7 m = 94.2 ft
Main Spans: 1 at 26.2 m = 86.0 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 12.3 m = 40.4 ft (2 Lanes) and Out-To-Out: 13.7 m = 44.9 ft for a 12.5 m = 41.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Webster [73895]: Worcester County [027], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 3
.1 MI.EST.OF ST-12
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 58.1 metric ton = 63.9 tons (Load Factor(LF) [1])
Inventory: 34.8 metric ton = 38.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 18170 (2019) and Trucks: 4%
Future ADT: 23690 (In 2032 )
I 395 NB over ST 16 GORE RD (Route: 395)
Num:W120261QLDOTNBIx
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 28.7 m = 94.2 ft
Main Spans: 1 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 13.2 m = 43.3 ft (3 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 13.2 m = 43.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Webster [73895]: Worcester County [027], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 3
EXIT 2
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 57.7 metric ton = 63.5 tons (Load Factor(LF) [1])
Inventory: 34.6 metric ton = 38.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 18416 (2019) and Trucks: 4%
Future ADT: 23690 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider