HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


MAPLE AVE over N SHORE CHANNEL (Route: 0)
Num:16995900000000x
Open: no restriction [A]
Built: 1909, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Open Grating [3] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 43.9 m = 144.0 ft
Main Spans: 3 at 21.6 m = 70.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 11.8 m = 38.7 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [06255]: Cook County [031], Illinois [17]
Owned by Other Local Agencies [25], DOT District: 1
WILMETTE
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 45 metric ton = 49.5 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Inventory: 30.1 metric ton = 33.1 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2018 [1118] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 200 (2018) and Trucks: 14%
Future ADT: 412 (In 2032 )
ISABELLA ST over N SHORE CHANNEL (Route: 0)
Num:16695000000000x
Open: no restriction [A]
Built: 1908, Reconstructed: 1977
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 53.6 m = 175.9 ft
Main Spans: 3 at 21.6 m = 70.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01845]: Cook County [031], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 1
1 M E GREEN BAY P6
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 78.4 metric ton = 86.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 39.9 metric ton = 43.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1750 (2018) and Trucks: 3%
Future ADT: 2000 (In 2036 )
LINDEN AVE over N SHORE CHANNEL (Route: 0)
Num:16995800000000x
Open: no restriction [A]
Built: 1909, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Open Grating [3] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 43.9 m = 144.0 ft
Main Spans: 3 at 21.6 m = 70.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 11.8 m = 38.7 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [06255]: Cook County [031], Illinois [17]
Owned by Other Local Agencies [25], DOT District: 1
WILMETTE
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 42.1 metric ton = 46.3 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Inventory: 29.5 metric ton = 32.5 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2018 [1118] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1400 (2018) and Trucks: 5%
Future ADT: 3039 (In 2032 )
SHERIDAN RD over N SHORE CHANNEL (Route: 0)
Num:16062000000000x
Open: no restriction [A]
Built: 1911, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 64 m = 210.0 ft
Main Spans: 5 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14 m = 45.9 ft (4 Lanes) and Out-To-Out: 19.3 m = 63.3 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [06255]: Cook County [031], Illinois [17]
Owned by Other Local Agencies [25], DOT District: 1
2.5 M N ILL 58 P12
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 33.7 metric ton = 37.1 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Inventory: 17.2 metric ton = 18.9 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2018 [1118] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 10500 (2018) and Trucks: 3%
Future ADT: 9682 (In 2032 )
CENTRAL ST over N SHORE CHANNEL (Route: 0)
Num:16695100000000x
Open: no restriction [A]
Built: 1908, Reconstructed: 1975
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 56.7 m = 186.0 ft
Main Spans: 3 at 21.9 m = 71.9 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 18.8 m = 61.7 ft for a 14.9 m = 48.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01845]: Cook County [031], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.6 M E GREEN BAYP6
Condition
Deck: Poor [4]
Superstructure: Serious [3]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.4 metric ton = 62.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 33.7 metric ton = 37.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 9650 (2018) and Trucks: 4%
Future ADT: 10000 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider