HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


ST123 CENTER ST over WATER TROUT BROOK (Route: 123)
Num:B2503742RMUNNBIx
Open: no restriction [A]
Built: 1901, Reconstructed: 1993
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.6 m = 24.9 ft
Main Spans: 1 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 10.5 m = 34.5 ft (2 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Brockton [09000]: Plymouth County [023], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 5
AT JCT PLYMOUTH ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 76.3 metric ton = 83.9 tons (Load Factor(LF) [1])
Inventory: 45.7 metric ton = 50.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present minimum criteria [6] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 12900 (2019) and Trucks: 7%
Future ADT: 41062 (In 2032 )
HWY PERKINS ST over WATER SALISBURY BROOK (Route: 0)
Num:B25064453MUNNBIx
Open: no restriction [A]
Built: 1914, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7 m = 23.0 ft
Main Spans: 1 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Brockton [09000]: Plymouth County [023], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 5
0.3 MI E OF RT 28
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 69.6 metric ton = 76.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present minimum criteria [6] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6300 (2020) and Trucks: 5%
Future ADT: 11687 (In 2031 )
ST 28 MONTELLO ST over WATER SALISBURY BROOK (Route: 28)
Num:B2500946FDOTNBIx
Open: no restriction [A]
Built: 1889, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 1 at 6.7 m = 22.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.9 m = 29.2 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Brockton [09000]: Plymouth County [023], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 5
0.75 M N OF GROVE ST
Condition
Deck: Not Applicable [N]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 99.9 metric ton = 109.9 tons (No rating analysis or evaluation performed [5])
Inventory: 41 metric ton = 45.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8642 (2020) and Trucks: 7%
Future ADT: 28427 (In 2033 )
HWY OTIS ST over WATER SALISBURY BROOK (Route: 0)
Num:B25007450MUNNBIx
Open: would be posted or closed except for temporary shoring [D]
Built: 1913, Reconstructed: 1973
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 8 m = 26.2 ft
Main Spans: 1 at 7.1 m = 23.3 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 8.3 m = 27.2 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Brockton [09000]: Plymouth County [023], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 5
.1 MI S OF CRESCENT S
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 51.8 metric ton = 57.0 tons (Allowable Stress(AS) [2])
Inventory: 32.8 metric ton = 36.1 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 600 (2019) and Trucks: 3%
Future ADT: 3159 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider