Bridge Type
Main Span(s): Steel [3] Arch - Thru [12]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 748 m = 2454.2 ft
Main Spans: 1 at 166.4 m = 546.0 ft
Approach Spans: 11
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 5.18 m = 17.0 ft and Navigational Clearance: 24.7 m = 81.0 ft
Location
Unknown [05190]: Carroll County [015], Illinois [17]
Owned by State Highway Agency [01], DOT District: 2
NW EDGE OF SAVANNA
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 46 metric ton = 50.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35.6 metric ton = 39.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 6.8 km = 4.2 mi
Traffic
ADT: 1950 (2019) and Trucks: 8%
Future ADT: 2100 (In 2040
)