HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


HWY DEPOT ST over WATER DWIGHT MFG CANAL (Route: 0)
Num:C13055AEYMUNNBIx
Open: no restriction [A]
Built: 1997, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 1 at 7.2 m = 23.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Chicopee [13660]: Hampden County [013], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 2
UNDER I391 @ DELTA PARK
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 63.5 metric ton = 69.9 tons (Allowable Stress(AS) [2])
Inventory: 41.1 metric ton = 45.2 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 300 (2019) and Trucks: 5%
Future ADT: 1579 (In 2032 )
I 391 over ST116 CENTER ST (Route: 391)
Num:C130400WKDOTNBIx
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 62.5 m = 205.1 ft
Main Spans: 2 at 30.9 m = 101.4 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 31.4 m = 103.0 ft (6 Lanes) and Out-To-Out: 34.5 m = 113.2 ft for a 31.4 m = 103.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Chicopee [13660]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
MM 1.0 ON I-391
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 71.8 metric ton = 79.0 tons (Load Factor(LF) [1])
Inventory: 43 metric ton = 47.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment:
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of relocation of road. [32]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 38017 (2017) and Trucks: 10%
Future ADT: 59540 (In 2032 )
I 391 over COMB CHIC R/STS & RLF (Route: 391)
Num:C130410WLDOTNBIx
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 690.4 m = 2265.2 ft
Main Spans: 20 at 56.7 m = 186.0 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 32.2 m = 105.6 ft (6 Lanes) and Out-To-Out: 33.9 m = 111.2 ft for a 31.7 m = 104.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Chicopee [13660]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
1.1 TO 1.5 M N SPFLD C.L.
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 40.2 metric ton = 44.2 tons (Load Factor(LF) [1])
Inventory: 24.3 metric ton = 26.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.4 km = 0.2 mi
Traffic
ADT: 48014 (2017) and Trucks: 12%
Future ADT: 70473 (In 2031 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider