HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 10


HWY RACE ST over WATER THIRD LEVEL CANAL (Route: 0)
Num:H21066AHPMUNNBIx
Open: no restriction [A]
Built: 1850, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 9.8 m = 32.2 ft
Main Spans: 2 at 4.6 m = 15.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 24.2 m = 79.4 ft for a 10.1 m = 33.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 2
.05 M NE OF SOUTH STREET
Condition
Deck: Not Applicable [N]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 23 metric ton = 25.3 tons (No rating analysis or evaluation performed [5])
Inventory: 23 metric ton = 25.3 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 905 (2019) and Trucks: 6%
Future ADT: 395 (In 2032 )
HWY MAIN ST over WATER THIRD LEVEL CANAL (Route: 0)
Num:H21010132DOTNBIx
Open: no restriction [A]
Built: 1978, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.8 m = 124.0 ft
Main Spans: 1 at 36.9 m = 121.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16.1 m = 52.8 ft (4 Lanes) and Out-To-Out: 20.6 m = 67.6 ft for a 16.2 m = 53.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
N OF SOUTH ST.
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 70.6 metric ton = 77.7 tons (Load Factor(LF) [1])
Inventory: 42.4 metric ton = 46.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 26121 (2016) and Trucks: 6%
Future ADT: 20626 (In 2031 )
I 391 & RAMPS ABCD over COMB MAIN ST & PVRR (Route: 391)
Num:H210600WTDOTNBIx
Open: no restriction [A]
Built: 1980, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 780.1 m = 2559.5 ft
Main Spans: 18 at 41.1 m = 134.8 ft
Approach Spans: 6
Skew: 99
Width, Roadway: 32.3 m = 106.0 ft (6 Lanes) and Out-To-Out: 33.9 m = 111.2 ft for a 33.9 m = 111.2 ft approaching roadway.
Vertical Clearance: 4.75 m = 15.6 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
.1 M N JCT CONN RIVER
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 51.4 metric ton = 56.5 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 38678 (2019) and Trucks: 14%
Future ADT: 50380 (In 2031 )
HWY JACKSON ST over WATER SECOND LEVEL CANAL (Route: 0)
Num:H21011AH9MUNNBIx
Open: no restriction [A]
Built: 1996, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 34.7 m = 113.9 ft
Main Spans: 2 at 16.4 m = 53.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 2
.3 MI NW OF 3RD CANAL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 80.1 metric ton = 88.1 tons (Allowable Stress(AS) [2])
Inventory: 37.8 metric ton = 41.6 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 4559 (2017) and Trucks: 5%
Future ADT: 4436 (In 2031 )
HWY JACKSON ST over WATER THIRD LVL CNL SPWY (Route: 0)
Num:H21067AHKMUNNBIx
Posted for load [P]
Built: 1850, Reconstructed: 1920
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.8 m = 32.2 ft
Main Spans: 1 at 9.8 m = 32.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.3 m = 40.4 ft (2 Lanes) and Out-To-Out: 19.5 m = 64.0 ft for a 12.3 m = 40.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 2
AT JCT. OF MAIN STREET
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 43.2 metric ton = 47.5 tons (Allowable Stress(AS) [2])
Inventory: 43.2 metric ton = 47.5 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6466 (2019) and Trucks: 4%
Future ADT: 7352 (In 2032 )
HWY SOUTH ST over RR PVRR (Route: 0)
Num:H21026147DOT634x
Open: no restriction [A]
Built: 1961, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.8 m = 42.0 ft
Main Spans: 1 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 15.2 m = 49.9 ft for a 10.1 m = 33.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
.2 M W JCT MAIN ST
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 50.2 metric ton = 55.2 tons (Allowable Stress(AS) [2])
Inventory: 34 metric ton = 37.4 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4100 (2020) and Trucks: 6%
Future ADT: 4090 (In 2031 )
HWY SARGEANT ST over WATER FIRST LEVEL CANAL (Route: 0)
Num:H210220LYMUNNBIx
Open: no restriction [A]
Built: 1909, Reconstructed: 1997
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 23.2 m = 76.1 ft
Main Spans: 1 at 22.8 m = 74.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 17.2 m = 56.4 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 2
.4 MI NW OF 3RD CANAL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86.4 metric ton = 95.0 tons (Load Factor(LF) [1])
Inventory: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6724 (2016) and Trucks: 6%
Future ADT: 11087 (In 2031 )
HWY SARGEANT ST over WATER SECOND LEVEL CANAL (Route: 0)
Num:H210120LUMUNNBIx
Posted for load [P]
Built: 1850, Reconstructed: 1925
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 32.5 m = 106.6 ft
Main Spans: 2 at 15.4 m = 50.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 2
AT INT OF RACE/SARGEANT
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 25.4 metric ton = 27.9 tons (Allowable Stress(AS) [2])
Inventory: 16.2 metric ton = 17.8 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3879 (2019) and Trucks: 6%
Future ADT: 9476 (In 2032 )
I 391 over WATER CONNECTICUT RIVER (Route: 391)
Num:C130390WFDOTNBIx
Open: no restriction [A]
Built: 1979, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 287.8 m = 944.3 ft
Main Spans: 5 at 62.5 m = 205.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 32.3 m = 106.0 ft (6 Lanes) and Out-To-Out: 35 m = 114.8 ft for a 32.3 m = 106.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Chicopee [13660]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
MM 4.5 ON I-391
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 50.9 metric ton = 56.0 tons (Load Factor(LF) [1])
Inventory: 30.5 metric ton = 33.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Superior to present desirable criteria [9]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 37200 (2019) and Trucks: 10%
Future ADT: 50380 (In 2031 )
HWY CABOT ST over WATER FIRST LEVEL CANAL (Route: 0)
Num:H210210LWMUNNBIx
Open: no restriction [A]
Built: 1924, Reconstructed: 1988
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 34 m = 111.6 ft
Main Spans: 3 at 13.1 m = 43.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Holyoke [30840]: Hampden County [013], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 2
.5 MI NW OF 3RD CANAL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 63.5 metric ton = 69.9 tons (Load Factor(LF) [1])
Inventory: 38 metric ton = 41.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 15129 (2019) and Trucks: 2%
Future ADT: 13424 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider