BRISTOL STREET over GRIFFIN CREEK (Route: 0)
Num:2255180x
Open: no restriction [A]
Built: 1974, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 22.6 m = 74.2 ft
Main Spans: 1 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 36
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cuba [19356]: Allegany County [003], New York [36]
Owned by Town or Township Highway Agency [03], DOT District: 61
IN CUBA
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 86.2 metric ton = 94.8 tons (Load Factor(LF) [1])
Inventory: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 552 (2018) and Trucks: 5%
Future ADT: 773 (In 2038 )
WEST MAIN STREET over GRIFFIN CREEK (Route: 0)
Num:2215410x
Open: no restriction [A]
Built: 1945, Reconstructed: 1994
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Wood or timber [7] Slab [01]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 11.8 m = 38.7 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 9 m = 29.5 ft (2 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cuba [19356]: Allegany County [003], New York [36]
Owned by Town or Township Highway Agency [03], DOT District: 61
0.4 MI W OF SH 305 - CUBA
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 81 metric ton = 89.1 tons ()
Inventory: 40.8 metric ton = 44.9 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 939 (2018) and Trucks: 6%
Future ADT: 1315 (In 2038 )
BULL STREET over GRIFFIN CREEK (Route: 0)
Num:2215420x
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Wood or Timber [8] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.7 m = 35.1 ft
Main Spans: 1 at 10 m = 32.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 7.3 m = 24.0 ft for a 5.8 m = 19.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cuba [19356]: Allegany County [003], New York [36]
Owned by Town or Township Highway Agency [03], DOT District: 61
IN CUBA
Condition
Deck: Good [7]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 24 metric ton = 26.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 18.5 metric ton = 20.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 742 (2018) and Trucks: 4%
Future ADT: 1039 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.