Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 20.7 m = 67.9 ft
Main Spans: 3 at 5.8 m = 19.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.5 m = 18.0 ft (2 Lanes) and Out-To-Out: 6.6 m = 21.7 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Dover [17405]: Norfolk County [021], Massachusetts [25]
Owned by Town or Township Highway Agency [03], DOT District: 6
DOVER-NEEDHAM TOWN LINE
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 99.9 metric ton = 109.9 tons (No rating analysis or evaluation performed [5])
Inventory: 53.6 metric ton = 59.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Superior to present desirable criteria [9] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 11900 (2020) and Trucks: 3%
Future ADT: 13898 (In 2033
)