Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 16.8 m = 55.1 ft
Main Spans: 1 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [04965]: Winnebago County [201], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 2
0.5 MI N OF 15TH AVE
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 20.4 metric ton = 22.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 12.3 metric ton = 13.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3750 (2020) and Trucks: 5%
Future ADT: 4400 (In 2040
)