Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 102.7 m = 337.0 ft
Main Spans: 2 at 51.2 m = 168.0 ft
Approach Spans: 0
Skew: 53
Width, Roadway: 18.2 m = 59.7 ft (6 Lanes) and Out-To-Out: 24.3 m = 79.7 ft for a 18.2 m = 59.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Dearborn [21000]: Wayne County [163], Michigan [26]
Owned by State Highway Agency [01], DOT District: 7
IN DEARBORN
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 79.7 metric ton = 87.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 47.6 metric ton = 52.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 19830 (1978) and Trucks: 0%
Future ADT: 19830 (In 2010
)