Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 39.9 m = 130.9 ft
Main Spans: 1 at 38.4 m = 126.0 ft
Approach Spans: 0
Skew: 37
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hornell [35672]: Steuben County [101], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 64
IN HORNELL
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 85.3 metric ton = 93.8 tons (Load Factor(LF) [1])
Inventory: 40.8 metric ton = 44.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 911 (2017) and Trucks: 4%
Future ADT: 1127 (In 2039
)