Nearby Bridges in NBI 2021: 4


HWY CAMBRIDGE ST over COMB I 90 & MBTA/CSX (Route: 90)
Num:B160564REDOTNBIx
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 144.5 m = 474.1 ft
Main Spans: 5 at 39.7 m = 130.3 ft
Approach Spans: 0
Skew: 60
Width, Roadway: 20.7 m = 67.9 ft (4 Lanes) and Out-To-Out: 27.8 m = 91.2 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
.2 MI W.RAILROAD YDS S101
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.5 metric ton = 47.9 tons (Allowable Stress(AS) [2])
Inventory: 32.7 metric ton = 36.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 12
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 50005 (2018) and Trucks: 5%
Future ADT: 31428 (In 2032 )
I 90 over HWY SERVICE RD (Route: 90)
Num:B163534RGDOTNBIx
Open: no restriction [A]
Built: 1965, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface:
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 1 at 8.5 m = 27.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 34.1 m = 111.9 ft (8 Lanes) and Out-To-Out: 35.1 m = 115.2 ft for a 34.1 m = 111.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
AT RAILROAD YARDS S110
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 132675 (2017) and Trucks: 6%
Future ADT: 191959 (In 2031 )
I 90 over OTHER RELIEF (Route: 90)
Num:B163544RHDOTNBIx
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 14 m = 45.9 ft
Main Spans: 1 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 62
Width, Roadway: 35.2 m = 115.5 ft (8 Lanes) and Out-To-Out: 36.6 m = 120.1 ft for a 35.2 m = 115.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
AT RAILROAD YARDS S102
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 132675 (2017) and Trucks: 6%
Future ADT: 191959 (In 2031 )
HWY EVERETT ST over COMB I90&CSX/MBTA&LNCLN (Route: 90)
Num:B160584RDDOTNBIx
Open: no restriction [A]
Built: 1964, Reconstructed: 1993
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 131.7 m = 432.1 ft
Main Spans: 6 at 23.8 m = 78.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
1.6 KM W.RAILROAD YARDS S
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 66.3 metric ton = 72.9 tons (Load Factor(LF) [1])
Inventory: 39.7 metric ton = 43.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 14500 (2019) and Trucks: 2%
Future ADT: 5212 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.