HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


HWY ARSENAL ST over WATER CHARLES RIVER (Route: 0)
Num:B160154EFDOTNBIx
Open: no restriction [A]
Built: 1925, Reconstructed: 1968
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 61.9 m = 203.1 ft
Main Spans: 2 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 15.3 m = 50.2 ft (4 Lanes) and Out-To-Out: 19.5 m = 64.0 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 4 m = 13.1 ft
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
CITY LINE WAT BOS
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 83.3 metric ton = 91.6 tons (Load Factor(LF) [1])
Inventory: 38.3 metric ton = 42.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 30800 (2019) and Trucks: 7%
Future ADT: 63172 (In 2032 )
HWY WESTERN AVE over HWY SOLDIERS FIELD RD (Route: 0)
Num:B164004F1DOTNBIx
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.1 m = 65.9 ft
Main Spans: 2 at 9.4 m = 30.8 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 20.7 m = 67.9 ft (4 Lanes) and Out-To-Out: 24.6 m = 80.7 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
.1 MI N OF BIRMINGHAM PKW
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 59.4 metric ton = 65.3 tons (Load Factor(LF) [1])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 29000 (2016) and Trucks: 7%
Future ADT: 79281 (In 2031 )
HWY MARKET ST over COMB I 90 & MBTA/CSX (Route: 90)
Num:B160594TTDOTNBIx
Open: no restriction [A]
Built: 1964, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 57 m = 187.0 ft
Main Spans: 3 at 20.1 m = 65.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 16.5 m = 54.1 ft (4 Lanes) and Out-To-Out: 22 m = 72.2 ft for a 16.5 m = 54.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
.2 MI S. CHARLES RV S41
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 50.9 metric ton = 56.0 tons (Load Factor(LF) [1])
Inventory: 39.3 metric ton = 43.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 19000 (2017) and Trucks: 5%
Future ADT: 31428 (In 2032 )
I 90 EB over US 20 N BEACON ST (Route: 90)
Num:B160604RJDOTNBIx
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.8 m = 124.0 ft
Main Spans: 2 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 16.1 m = 52.8 ft (4 Lanes) and Out-To-Out: 17.5 m = 57.4 ft for a 16 m = 52.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
.2 MI S. CHARLES RV S39
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 72.5 metric ton = 79.8 tons (Load Factor(LF) [1])
Inventory: 43.4 metric ton = 47.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 68599 (2019) and Trucks: 9%
Future ADT: 164868 (In 2031 )
I 90 WB over US 20 N BEACON ST (Route: 90)
Num:B160604RKDOTNBIx
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.8 m = 124.0 ft
Main Spans: 2 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 16 m = 52.5 ft (4 Lanes) and Out-To-Out: 17.5 m = 57.4 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boston [07000]: Suffolk County [025], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
.2 MI S. CHARLES RV S39
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 67.6 metric ton = 74.4 tons (Load Factor(LF) [1])
Inventory: 40.5 metric ton = 44.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 67230 (2019) and Trucks: 9%
Future ADT: 164868 (In 2031 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider