CASS AVE over I-94 (Route: 2000)
Num:11209x
Open: would be posted or closed except for temporary shoring [D]
Built: 1955, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 58 m = 190.3 ft
Main Spans: 4 at 18.2 m = 59.7 ft
Approach Spans: 0
Skew: 16
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 24.9 m = 81.7 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Detroit [22000]: Wayne County [163], Michigan [26]
Owned by State Highway Agency [01], DOT District: 7
IN DETROIT
Condition
Deck: Serious [3]
Superstructure: Satisfactory [6]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.1 metric ton = 61.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 28.8 metric ton = 31.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 14980 (1995) and Trucks: 3%
Future ADT: 14980 (In 2015 )
M-1 WOODWARD AVE over I-94 (Route: 1)
Num:11210x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 71.5 m = 234.6 ft
Main Spans: 2 at 38.5 m = 126.3 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 25.3 m = 83.0 ft (5 Lanes) and Out-To-Out: 33.2 m = 108.9 ft for a 25.3 m = 83.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Detroit [22000]: Wayne County [163], Michigan [26]
Owned by State Highway Agency [01], DOT District: 7
IN DETROIT
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: Greater than HL93 [B]
Operating: 63.8 metric ton = 70.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 49.2 metric ton = 54.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 20804 (2007) and Trucks: 3%
Future ADT: 22274 (In 2018 )
JOHN R ST over I-94 (Route: 2000)
Num:11211x
Open: no restriction [A]
Built: 1955, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 52.4 m = 171.9 ft
Main Spans: 4 at 17.6 m = 57.7 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 13.4 m = 44.0 ft (4 Lanes) and Out-To-Out: 18.8 m = 61.7 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Detroit [22000]: Wayne County [163], Michigan [26]
Owned by State Highway Agency [01], DOT District: 7
IN DETROIT
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 62.9 metric ton = 69.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 37.6 metric ton = 41.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2264 (2010) and Trucks: 3%
Future ADT: 2490 (In 2025 )
SECOND BLVD over I-94 (Route: 2000)
Num:11208x
Bridge closed to all traffic [K]
Built: 1954, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 65.2 m = 213.9 ft
Main Spans: 4 at 22.2 m = 72.8 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 18.2 m = 59.7 ft (4 Lanes) and Out-To-Out: 24.9 m = 81.7 ft for a 18.2 m = 59.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Detroit [22000]: Wayne County [163], Michigan [26]
Owned by State Highway Agency [01], DOT District: 7
IN DETROIT
Condition
Deck: Serious [3]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 72.9 metric ton = 80.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 43.7 metric ton = 48.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 985 (2017) and Trucks: 4%
Future ADT: 1025 (In 2037 )
BRUSH ST over I-94 (Route: 2000)
Num:11212x
Open: no restriction [A]
Built: 2019, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 69.6 m = 228.4 ft
Main Spans: 2 at 36.8 m = 120.7 ft
Approach Spans: 0
Skew: 2
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 18.5 m = 60.7 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Detroit [22000]: Wayne County [163], Michigan [26]
Owned by State Highway Agency [01], DOT District: 7
IN DETROIT
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design: Greater than HL93 [B]
Operating: 94 metric ton = 103.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 47.6 metric ton = 52.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Superior to present desirable criteria [9]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 10615 (2017) and Trucks: 4%
Future ADT: 10975 (In 2037 )