RT117 MAIN ST over I 95 /ST128 (Route: 117)
Num:W040282K3DOTNBIx
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 66.4 m = 217.9 ft
Main Spans: 4 at 22.9 m = 75.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 18.5 m = 60.7 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waltham [72600]: Middlesex County [017], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 4
0.5 MI NLY RT 20
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: M 18 / H 20 [4]
Operating: 48.2 metric ton = 53.0 tons (Load Factor(LF) [1])
Inventory: 28.8 metric ton = 31.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 18600 (2018) and Trucks: 3%
Future ADT: 61435 (In 2032 )
US 20 WB/WESTON ST over I 95 /ST128 (Route: 20)
Num:W040322E3DOTNBIx
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 74.7 m = 245.1 ft
Main Spans: 2 at 26.2 m = 86.0 ft
Approach Spans: 2
Skew: 17
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 14.1 m = 46.3 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 5.94 m = 19.5 ft and Navigational Clearance: 0 = N/A
Location
Waltham [72600]: Middlesex County [017], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 4
RT 20 WB AT RT 128
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 43.3 metric ton = 47.6 tons (Load Factor(LF) [1])
Inventory: 25.9 metric ton = 28.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 27600 (2016) and Trucks: 13%
Future ADT: 49432 (In 2031 )
US 20 EB/WESTON ST over I 95 /ST128 (Route: 20)
Num:W040332E4DOTNBIx
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 75.6 m = 248.0 ft
Main Spans: 4 at 28 m = 91.9 ft
Approach Spans: 0
Skew: 28
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 15.3 m = 50.2 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 5.33 m = 17.5 ft and Navigational Clearance: 0 = N/A
Location
Waltham [72600]: Middlesex County [017], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 4
RT 20 EB AT RT 128
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 40.3 metric ton = 44.3 tons (Allowable Stress(AS) [2])
Inventory: 22.4 metric ton = 24.6 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 29250 (2014) and Trucks: 9%
Future ADT: 44062 (In 2031 )
US 20 WB over RR MBTA/BMRR (Route: 20)
Num:W290282E7DOTNBIx
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 44
Width, Roadway: 8.5 m = 27.9 ft (1 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Weston [77255]: Middlesex County [017], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
0.1 MI WLY RT 128
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 53.8 metric ton = 59.2 tons (Load Factor(LF) [1])
Inventory: 32.2 metric ton = 35.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 19400 (2019) and Trucks: 5%
Future ADT: 35060 (In 2032 )
US 20 EB over RR MBTA/BMRR (Route: 20)
Num:W290112E6DOTNBIx
Open: no restriction [A]
Built: 1950, Reconstructed: 1960
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 42.7 m = 140.1 ft
Main Spans: 3 at 19.5 m = 64.0 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 8.4 m = 27.6 ft (1 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Weston [77255]: Middlesex County [017], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 6
O
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 55.7 metric ton = 61.3 tons (Load Factor(LF) [1])
Inventory: 33.4 metric ton = 36.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21200 (2019) and Trucks: 5%
Future ADT: 36324 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.