Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 14.9 m = 48.9 ft
Main Spans: 1 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 4.3 m = 14.1 ft (1 Lanes) and Out-To-Out: 5.2 m = 17.1 ft for a 5.2 m = 17.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cummington [16040]: Hampshire County [015], Massachusetts [25]
Owned by Town or Township Highway Agency [03], DOT District: 1
150' W OF INT W/LILAC AVE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 53.9 metric ton = 59.3 tons (Load Factor(LF) [1])
Inventory: 32.3 metric ton = 35.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 129 (2018) and Trucks: 6%
Future ADT: 632 (In 2031
)